SL2 Echo
SL2 Echo is a renovation/alteration project at 7700 Floyd Curl, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $3.5M across about 5,255 sq ft.
๐Project Metrics
TDLR #TABS2025004356Project Closed
Project has been completed and closed
SL2 Echo is a Renovation/Alteration project located at 7700 Floyd Curl, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $3.5M covering 5,255 sq ft. Methodist Healthcare is the property owner and LK Design Group Inc. is the design firm of record. The project was registered with TDLR on October 29, 2024.
โFrequently Asked Questions
What is SL2 Echo?
SL2 Echo is a renovation/alteration project at 7700 Floyd Curl in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation
Is SL2 Echo open in San Antonio?
Construction on SL2 Echo is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is SL2 Echo located?
SL2 Echo is located at 7700 Floyd Curl, San Antonio, TX, 78229, in Bexar County.
Who is the owner or developer of SL2 Echo?
Methodist Healthcare is the property owner/developer of record for SL2 Echo, per its TDLR project registration.
Who is the architect or design firm for SL2 Echo?
LK Design Group Inc. is the design firm of record for SL2 Echo, according to its TDLR filing.
How much does SL2 Echo cost and how big is it?
SL2 Echo has an estimated construction value of $3.5M and approximately 5,255 square feet (about $666/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 29, 2024
Review Complete
Oct 29, 2024
Inspection Complete
Closed
Jan 10, 2026