Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility

241 Williamette Drive, Kingsland, TX, 78639

Target date passed (Jul 2025)Review Complete

Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility is a new construction project at 241 Williamette Drive, Kingsland, in Llano County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $750K across about 2,780 sq ft.

Estimated project value
$750K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,780 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$270/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 29, 2024275 days across supplied datesJul 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    241 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility

The Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility project at 241 Williamette Drive in Kingsland involves the new construction of two buildings totaling 2,780 square feet. The filing describes the scope as two CMU block structures: an office building and an unmanned blower building. Both are designed with single shed metal roofing. The office will contain an open workspace and a full restroom with a shower, while the blower building provides open space for the blower equipment.

This project is registered with TDLR under the name Office Kingsland: Two-Building Project. The estimated cost for the work is $750,000, which calculates to a cost of $270 per square foot. The owner of record is Kingsland MUD, with J. Horry listed as the General Manager. JNW Architects LLC is the design firm of record for this build.

Timeline and Status

TDLR completed plan review in October 2024, and construction was scheduled to begin in December 2024 with a completion date of July 2025. The registration status is Review Complete. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

In Llano County, the median estimated cost for similar new construction filings is $750,000, and the median size is 3,780 square feet. This project’s cost is close to the county median, and its scheduled build window of 241 days is close to the county median. The cost per square foot of $270 is above the county median of $211. JNW Architects LLC has six other TDLR-registered projects totaling $4,744,650, including work in Austin, Liberty Hill, and Lampasas.

The project involves public funds and public land. The ZIP code 78639 has a population of about 8,517, with a median household income of $57,034. Housing in the area is predominantly owner-occupied, with a median owner-occupied home value of $249,100. The Llano County unemployment rate was 4.4 percent in July 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78639 (Kingsland)

One email per change. Unsubscribe in one click. Privacy.

Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility is a New Construction project located at 241 Williamette Drive, Kingsland, TX 78639 in Kingsland, Texas. The project has an estimated value of $750K covering 2,780 sq ft. Kingsland MUD / J. Horry, General Manager is the property owner and JNW Architects LLC is the design firm of record. The project was registered with TDLR on October 29, 2024.

Frequently Asked Questions

What is being built at 241 Williamette Drive?

The project includes an office building with a restroom and shower, and an unmanned blower building. Both are CMU block structures with metal roofing, totaling 2,780 square feet.

Is the Kingsland MUD facility open?

The TDLR record shows the project is under construction with a scheduled completion in July 2025. TDLR has not yet recorded a final inspection, so the site's operational status is not confirmed in the public record.

Who is the architect for this project?

JNW Architects LLC is the design firm of record. They have completed six other TDLR-registered projects in the region, including work in Austin and Liberty Hill.

What is the estimated cost of the build?

The estimated cost is $750,000. This is close to the median cost for similar new construction projects in Llano County, which is also $750,000.

When was plan review completed?

TDLR completed plan review in October 2024. Construction was scheduled to start in December 2024 and finish in July 2025.

What is Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility?

Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility is a new construction project at 241 Williamette Drive in Kingsland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Consists of construction of two CMU block buildings; an office and a unmanned blower building. Both will have single shed metal roofing. The office will open workspace and a full restroom with shower. The blower building will open space…

Is Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility open in Kingsland?

Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility located?

Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility is located at 241 Williamette Drive, Kingsland, TX, 78639, in Llano County.

Who is the owner or developer of Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility?

Kingsland MUD / J. Horry, General Manager is the property owner/developer of record for Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility, per its TDLR project registration.

Who is the architect or design firm for Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility?

JNW Architects LLC is the design firm of record for Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility, according to its TDLR filing.

How much does Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility cost and how big is it?

Kingsland Municipal Utility District (KMUD) Secondary Treatment Facility has an estimated construction value of $750K and approximately 2,780 square feet (about $270/sqft), based on its TDLR filing.

Scope of Work

Consists of construction of two CMU block buildings; an office and a unmanned blower building. Both will have single shed metal roofing. The office will open workspace and a full restroom with shower. The blower building will open space for blower.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

241 Williamette Drive, Kingsland, TX, 78639

30.68541, -98.42667

Watch all construction in 78639 (Kingsland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Kingsland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.