Caldwell Crossing Section 4 Landscape Improvements in Rosharon, TX

Daily Crossing & Bayberry Dr. (intersection), Rosharon, TX, 77583

Construction complete · Apr 2026Project Closed

Caldwell Crossing Section 4 Landscape Improvements is a new construction project at Daily Crossing & Bayberry Dr. (intersection), Rosharon, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $473K across about 50,000 sq ft.

Estimated project value
$473K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
50,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 8, 2024526 days across supplied datesApr 18, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    68 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    259 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    85 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Caldwell Crossing Section 4 Landscape Improvements

Caldwell Crossing Section 4 Landscape Improvements is a completed new construction project in Rosharon, Texas. The work took place at the intersection of Daily Crossing and Bayberry Dr. in Brazoria County. The scope covered concrete sidewalk installation, landscape development, and irrigation systems across a 50,000 sq ft area. The estimated cost for this project was $473,100. DR Horton served as the owner of record, while KGA DeForest Design, LLC acted as the design firm. Jeromy G Murphy was the registered accessibility specialist on file. This project involved public funds, public land, or was a Federally funded roadway project.

The accessibility review process concluded in early 2026. TDLR closed the project file in April 2026, which marks the end of the accessibility review process for this construction. The final inspection passed in January 2026. Construction started in January 2025, following a scheduled build window of 259 days. Plan review was completed in November 2024, shortly after the project registered with TDLR in the same month. The completion date listed on the filing was October 2025.

Project Context and Comparisons

This project's cost is below the county median for its type. The median estimated cost for new construction filings in Brazoria County is $800,000. The median size for such projects is 9,114 sq ft, making this project significantly larger. The median cost per square foot in the county is $119, whereas this project came in at $9 per sq ft. The scheduled build window of 259 days is close to the county median of 222 days. These figures are computed from 1,480 TDLR-registered new construction filings in Brazoria County.

DR Horton has six other TDLR-registered projects totaling $9,993,000. These include Tamarron Pond MY Landscape Improvements in Brookshire and Lonestar at Liberty Trails Amenity Center in Fort Worth. KGA DeForest Design, LLC has six other registered projects totaling $7,507,921. Notable entries include Mason Woods Section 6 Landscape Improvements in Cypress and Talon Ridge Community in Beasley. All listed projects for both entities show a status of review complete.

Rosharon is part of ZIP code 77583. U.S. Census ACS 2023 five-year estimates indicate a population of about 47,646. The median household income is $107,510, and the median owner-occupied home value is $298,000. Housing in this area is predominantly owner-occupied. Brazoria County unemployment rate (FRED, August 2026) was 5.1 percent, lower than a year earlier.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77583 (Rosharon)

One email per change. Unsubscribe in one click. Privacy.

Caldwell Crossing Section 4 Landscape Improvements is a New Construction project located at Daily Crossing & Bayberry Dr. (intersection), Rosharon, TX 77583 in Rosharon, Texas. The project has an estimated value of $473K covering 50,000 sq ft. DR Horton is the property owner and KGA DeForest Design, LLC is the design firm of record. The project was registered with TDLR on November 8, 2024.

Frequently Asked Questions

What was the scope of work for Caldwell Crossing Section 4?

The scope included concrete sidewalk, landscape, and irrigation. The project covered 50,000 sq ft at the intersection of Daily Crossing and Bayberry Dr. in Rosharon.

Who was the owner and design firm for this project?

DR Horton was the owner of record. KGA DeForest Design, LLC was the design firm. Jeromy G Murphy served as the registered accessibility specialist.

When did construction start and end?

Construction started in January 2025. The final inspection passed in January 2026. TDLR closed the project file in April 2026.

How does the cost compare to other projects in Brazoria County?

The $473,100 cost is below the county median of $800,000. The $9 per sq ft cost is below the county median of $119 per sq ft.

Is the project finished?

Yes. The final inspection passed in January 2026. TDLR closed the project file in April 2026, marking the end of the accessibility review process.

What is Caldwell Crossing Section 4 Landscape Improvements?

Caldwell Crossing Section 4 Landscape Improvements is a new construction project at Daily Crossing & Bayberry Dr. (intersection) in Rosharon, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete sidewalk, landscape and irrigation

Is Caldwell Crossing Section 4 Landscape Improvements open in Rosharon?

Construction on Caldwell Crossing Section 4 Landscape Improvements is complete — TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.

Where is Caldwell Crossing Section 4 Landscape Improvements located?

Caldwell Crossing Section 4 Landscape Improvements is located at Daily Crossing & Bayberry Dr. (intersection), Rosharon, TX, 77583, in Brazoria County.

Who is the owner or developer of Caldwell Crossing Section 4 Landscape Improvements?

DR Horton is the property owner/developer of record for Caldwell Crossing Section 4 Landscape Improvements, per its TDLR project registration.

Who is the architect or design firm for Caldwell Crossing Section 4 Landscape Improvements?

KGA DeForest Design, LLC is the design firm of record for Caldwell Crossing Section 4 Landscape Improvements, according to its TDLR filing.

How much does Caldwell Crossing Section 4 Landscape Improvements cost and how big is it?

Caldwell Crossing Section 4 Landscape Improvements has an estimated construction value of $473K and approximately 50,000 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

Concrete sidewalk, landscape and irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Daily Crossing & Bayberry Dr. (intersection), Rosharon, TX, 77583

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77583 (Rosharon)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rosharon?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.