Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning
2012 Barry Rose Road, Pearland, TX, 77581
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning is a new construction project at 2012 Barry Rose Road, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $1.7M across about 2,331 sq ft.
- Estimated project value
- $1.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,331 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $744/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
59 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,012 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning
The City of Pearland is constructing a new 2,331 square foot Administration and Maintenance Building at the Barry Rose Water Reclamation Facility. Located at 2012 Barry Rose Road in Brazoria County, this new construction project is scheduled to finish in October 2027. The facility will house office space, a laboratory, a break room, restrooms, and a dedicated maintenance area.
Freese and Nichols, Inc. serves as the design firm of record for this infrastructure upgrade. The project was registered with the Texas Department of Licensing and Regulation in November 2024, with plan review completed in the same month. Construction work is set to begin in January 2025, establishing a build window that extends through late 2027.
Project Scope and Financials
The estimated cost for this development is $1,735,000, resulting in a cost of $744 per square foot. This figure places the project above the county median estimated cost of $800,000 for similar new construction filings in Brazoria County. The scheduled build window of 1,012 days is also longer than the county median of 224 days for comparable projects.
The site is situated within a FEMA Special Flood Hazard Area, designated as zone AE. The project involves public funds and public land, reflecting the municipal nature of the development. The City of Pearland has six other TDLR-registered projects on file, with a combined value of $35,056,349, indicating a broader pattern of infrastructure investment in the area.
Location and Context
The Barry Rose Water Reclamation Facility is part of the utility infrastructure serving the Pearland community. The surrounding area includes various commercial and residential services, such as healthcare providers and dining establishments. The project contributes to the operational capacity of the local water reclamation system, ensuring maintenance and administrative functions are housed in a purpose-built structure.
With plan review complete and construction scheduled to start in early 2025, the project moves into the execution phase. The detailed scope, including the laboratory and maintenance areas, supports the technical requirements of water reclamation operations. The registration status confirms the project’s compliance with state accessibility and construction standards.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77581 (Pearland)
One email per change. Unsubscribe in one click. Privacy.
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning is a New Construction project located at 2012 Barry Rose Road, Pearland, TX 77581 in Pearland, Texas. The project has an estimated value of $1.7M covering 2,331 sq ft. City of Pearland is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on November 11, 2024.
Frequently Asked Questions
When will the building be finished?
Construction is scheduled to finish in October 2027. Work is set to start in January 2025, following the completion of plan review in November 2024.
What is included in the new building?
The 2,331 square foot structure will include office space, a laboratory, a break room, restrooms, and a maintenance area at the Barry Rose Water Reclamation Facility.
Who is the owner of this project?
The City of Pearland is the owner and developer of record for this new Administration and Maintenance Building project.
Is the project in a flood zone?
Yes, the site is located inside a FEMA Special Flood Hazard Area, specifically designated as zone AE according to the National Flood Hazard Layer.
What is the estimated cost of the project?
The estimated cost is $1,735,000. This amount is above the county median estimated cost of $800,000 for new construction filings in Brazoria County.
What is Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning?
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning is a new construction project at 2012 Barry Rose Road in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new Administration and Maintenance Building at the Barry Rose Water Reclamation Facility. Building will include office space, laboratory, break room, restroom, and maintenance area. Total area of the building is 2,331 sf.
Is Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning open in Pearland?
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning is still under construction in Pearland, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning located?
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning is located at 2012 Barry Rose Road, Pearland, TX, 77581, in Brazoria County.
Who is the owner or developer of Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning?
City of Pearland is the property owner/developer of record for Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning, per its TDLR project registration.
Who is the architect or design firm for Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning?
Freese and Nichols, Inc. is the design firm of record for Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning, according to its TDLR filing.
How much does Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning cost and how big is it?
Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning has an estimated construction value of $1.7M and approximately 2,331 square feet (about $744/sqft), based on its TDLR filing.
Scope of Work
Construction of a new Administration and Maintenance Building at the Barry Rose Water Reclamation Facility. Building will include office space, laboratory, break room, restroom, and maintenance area. Total area of the building is 2,331 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2012 Barry Rose Road, Pearland, TX, 77581
Related Projects
Same Owner
$245.5M totalWatch all construction in 77581 (Pearland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pearland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.