Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Comal ISD | Davenport High School Ag and Poultry Facilities in San Antonio, TX
23255 FM 3009, San Antonio, TX, 78266
Comal ISD | Davenport High School Ag and Poultry Facilities is a renovation/alteration project at 23255 FM 3009, San Antonio, in Comal County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $4.7M across about 16,506 sq ft.
- Estimated project value
- $4.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 16,506 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $285/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
80 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
420 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
12 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
128 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Comal ISD | Davenport High School Ag and Poultry Facilities
Comal ISD | Davenport High School Ag and Poultry Facilities is a completed renovation and alteration project located at 23255 FM 3009 in San Antonio. The 16,506 sq ft facility was valued at $4,699,952. TDLR closed the project file in August 2026, marking the end of the accessibility review process for this construction.
Comal ISD is the owner of record, with Huckabee listed as the design firm. The registered accessibility specialist was Ross A Thomas. The project involved public funds and public land. The estimated cost per square foot was $285, which is above the county median of $85 for similar renovation and alteration filings in Comal County.
Timeline and Context
The project registered with TDLR in November 2024, and plan review was completed that same month. Construction began in January 2025. The scheduled build window was 420 days, longer than the 120-day median for comparable projects in the region. The filing indicated a completion date of March 2026, and the final inspection passed in April 2026.
This facility is part of a broader investment by Comal ISD, which has six other TDLR-registered projects totaling $106,541,915. These include a $60,500,000 project for Elementary School #21 in Spring Branch and a $25,000,000 new multipurpose building for Canyon High School in New Braunfels. Huckabee, the design firm, has also registered six other projects totaling $136,100,000, including the $63,800,000 Venus High School project.
The project is located in ZIP code 78266, where U.S. Census estimates show a population of about 7,274 and a median household income of $132,470. The area is predominantly owner-occupied, with a median home value of $553,200. Comal County’s unemployment rate was 4.3 percent in August 2026, according to FRED data. The completion of this ag and poultry facility adds to the local educational infrastructure in Comal County.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78266 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
Comal ISD | Davenport High School Ag and Poultry Facilities is a Renovation/Alteration project located at 23255 FM 3009, San Antonio, TX 78266 in San Antonio, Texas. The project has an estimated value of $4.7M covering 16,506 sq ft. Comal ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on November 12, 2024.
Frequently Asked Questions
What is the status of the Davenport High School ag facilities project?
The project is complete. TDLR closed the project file in August 2026 after the final inspection passed in April 2026. The construction and accessibility review process has ended.
Who designed the Comal ISD Davenport High School ag facilities?
Huckabee is the design firm of record for this project. The registered accessibility specialist was Ross A Thomas. Comal ISD is the owner of record.
How much did the Davenport High School renovation cost?
The estimated cost was $4,699,952. This translates to $285 per square foot for the 16,506 sq ft facility. This cost is above the county median for similar renovation projects.
When did construction on the ag and poultry facilities finish?
Construction began in January 2025. The final inspection passed in April 2026. The project file was closed by TDLR in August 2026, confirming the end of the regulatory process.
Is the Davenport High School ag facility open to the public?
The construction and accessibility review are complete. The TDLR record confirms the project file is closed. Specific public access hours or opening dates are not included in the construction filing facts.
What is Comal ISD | Davenport High School Ag and Poultry Facilities?
Comal ISD | Davenport High School Ag and Poultry Facilities is a renovation/alteration project at 23255 FM 3009 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Comal ISD | Davenport High School Ag and Poultry Facilities
Is Comal ISD | Davenport High School Ag and Poultry Facilities open in San Antonio?
Construction on Comal ISD | Davenport High School Ag and Poultry Facilities is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Comal ISD | Davenport High School Ag and Poultry Facilities located?
Comal ISD | Davenport High School Ag and Poultry Facilities is located at 23255 FM 3009, San Antonio, TX, 78266, in Comal County.
Who is the owner or developer of Comal ISD | Davenport High School Ag and Poultry Facilities?
Comal ISD is the property owner/developer of record for Comal ISD | Davenport High School Ag and Poultry Facilities, per its TDLR project registration.
Who is the architect or design firm for Comal ISD | Davenport High School Ag and Poultry Facilities?
Huckabee is the design firm of record for Comal ISD | Davenport High School Ag and Poultry Facilities, according to its TDLR filing.
How much does Comal ISD | Davenport High School Ag and Poultry Facilities cost and how big is it?
Comal ISD | Davenport High School Ag and Poultry Facilities has an estimated construction value of $4.7M and approximately 16,506 square feet (about $285/sqft), based on its TDLR filing.
Scope of Work
Comal ISD | Davenport High School Ag and Poultry Facilities
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
23255 FM 3009, San Antonio, TX, 78266
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$447.8M totalWatch all construction in 78266 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.