Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) in Annona, TX

Fr: E. City Limits of Annona To: Bowie County Line, Annona, TX, 75550

Target date passed (Mar 2026)Review Complete

Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) is a renovation/alteration project at Fr: E. City Limits of Annona To: Bowie County Line, Annona, in Red River County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.4M across about 1,800 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.35K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 12, 2024498 days across supplied datesMar 25, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    205 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    293 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Northeast Texas Trail - Avery Project (CSJ: 0901-27-054)

Csj: 0901-27-054, filed as the Northeast Texas Trail - Avery Project, involves the construction of a 10-foot-wide shared-use path in Annona, Texas. The filing, registered with TDLR in November 2024, covers a specific corridor from the East City Limits of Annona to the Bowie County Line. This renovation and alteration project is estimated at $2,426,501 and spans 1,800 square feet of new infrastructure.

TxDOT District: Paris serves as the owner of record for this Federally funded roadway project. Pape-Dawson Engineers, Inc. is the registered design firm, while Frank Fonseca is listed as the registered accessibility specialist. The scope of work includes the installation of an unpaved aggregate surface, bridge repair, drainage structures, handrails, signing, and bollards. These elements combine to create a functional path for both cyclists and pedestrians within the Red River County landscape.

Cost and Scale Context

With a computed cost of $1,348 per square foot, this project sits above the county median of $385 for similar renovation and alteration filings. The scheduled build window of 293 days is longer than the county median of 214 days. In comparison to other TDLR-registered renovation filings in Red River County, the estimated cost of $2,426,501 is above the median of $285,000. The size of 1,800 square feet is below the county median of 9,500 square feet for this specific project type.

Construction was scheduled to begin in June 2025, with a planned completion date of March 2026. Plan review was completed in November 2024. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The project remains under the jurisdiction of the Texas Department of Licensing and Regulation for accessibility compliance purposes.

Pape-Dawson Engineers, Inc. has six other TDLR-registered projects, totaling $10,015,868, across various Texas locations including San Antonio and McAllen. TxDOT District: Paris has six other registered projects totaling $78,306,098, with the largest in Rio Grande City at $67,050,991. The Annona project is one of multiple initiatives managed by these entities within the state’s infrastructure network.

Local Area Profile

Annona is located in Red River County. Census estimates for ZIP code 75550 indicate a population of about 506 and 271 housing units. The median household income is $68,750, and the median owner-occupied home value is $111,900. Housing in this area is predominantly owner-occupied. The Red River County unemployment rate was 5.6 percent in August 2026, which is lower than a year earlier. This project adds to the local infrastructure in a small, established community.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75550 (Annona)

One email per change. Unsubscribe in one click. Privacy.

Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) is a Renovation/Alteration project located at Fr: E. City Limits of Annona To: Bowie County Line, Annona, TX 75550 in Annona, Texas. The project has an estimated value of $2.4M covering 1,800 sq ft. TxDOT District: Paris is the property owner and Pape-Dawson Engineers, Inc. is the design firm of record. The project was registered with TDLR on November 12, 2024.

Frequently Asked Questions

What is the exact scope of work for this project?

The scope includes constructing a 10-foot-wide shared-use path with an unpaved aggregate surface. It also covers bridge repair, drainage structures, handrails, signing, and bollards installation.

Who is the owner and design firm?

TxDOT District: Paris is the owner of record. Pape-Dawson Engineers, Inc. is the design firm of record, and Frank Fonseca is the registered accessibility specialist.

Is the project finished?

The scheduled completion date was March 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

How much does this project cost?

The estimated cost is $2,426,501. This amounts to $1,348 per square foot, which is above the county median of $385 for similar renovation and alteration projects.

Where exactly is the project located?

The project runs from the East City Limits of Annona to the Bowie County Line in Annona, TX 75550, within Red River County.

What is Northeast Texas Trail - Avery Project (CSJ: 0901-27-054)?

Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) is a renovation/alteration project at Fr: E. City Limits of Annona To: Bowie County Line in Annona, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct 10ft-wide shared-use path. Include installation of unpaved aggregate surface shared-use path, bridge repair, drainage structures, handrails, signing and bollards.

Is Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) open in Annona?

Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) was scheduled to finish construction in Mar 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) located?

Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) is located at Fr: E. City Limits of Annona To: Bowie County Line, Annona, TX, 75550, in Red River County.

Who is the owner or developer of Northeast Texas Trail - Avery Project (CSJ: 0901-27-054)?

TxDOT District: Paris is the property owner/developer of record for Northeast Texas Trail - Avery Project (CSJ: 0901-27-054), per its TDLR project registration.

Who is the architect or design firm for Northeast Texas Trail - Avery Project (CSJ: 0901-27-054)?

Pape-Dawson Engineers, Inc. is the design firm of record for Northeast Texas Trail - Avery Project (CSJ: 0901-27-054), according to its TDLR filing.

How much does Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) cost and how big is it?

Northeast Texas Trail - Avery Project (CSJ: 0901-27-054) has an estimated construction value of $2.4M and approximately 1,800 square feet (about $1.35K/sqft), based on its TDLR filing.

Scope of Work

Construct 10ft-wide shared-use path. Include installation of unpaved aggregate surface shared-use path, bridge repair, drainage structures, handrails, signing and bollards.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Fr: E. City Limits of Annona To: Bowie County Line, Annona, TX, 75550

Loading location map…
33.58067, -94.91550