Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project in Lewisville, TX
2075 EDMONDS LN, Lewisville, TX, 75067
Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project is a renovation/alteration project at 2075 EDMONDS LN, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $21.0M across about 100,182 sq ft.
- Estimated project value
- $21.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 100,182 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $210/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
192 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
434 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
28 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project
Marshall Durham Middle School in Lewisville, Texas, has completed its 20-Year Life Cycle Maintenance and Repair Project. The renovation of the existing 100,182 sq ft building was valued at $21,000,000. Construction began in May 2025 and concluded in August 2026, passing its final TDLR accessibility inspection at that time.
The project was filed with the Texas Department of Licensing and Regulation (TDLR) in November 2024. Lewisville Independent School District serves as the owner of record for this renovation and alteration work. VLK Architects Inc is the design firm of record, while Bonita L Anderson is the registered accessibility specialist associated with the filing.
Project Scale and Cost Context
The estimated cost of $21,000,000 places this project above the median estimated cost for renovation and alteration filings in Denton County. The median cost for similar projects in the county is $237,622. The scheduled build window of 434 days is longer than the county median of 92 days. The cost per square foot is $210, which is above the county median of $81 per square foot.
Lewisville Independent School District has six other TDLR-registered projects totaling $44,275,493. These include Peters Colony ES in The Colony, Hebron High School in Carrollton, and Lewisville High School - Killough in Lewisville. VLK Architects Inc has six other TDLR-registered projects totaling $87,349,760, including Katy High School in Katy and PBTISD - Administration Building in Pecos.
Local Context and Records
The school is located at 2075 Edmonds Ln in Lewisville, within Denton County. U.S. Census American Community Survey estimates for ZIP code 75067 indicate a population of about 68,451. The median household income in this area is $76,630, and the median owner-occupied home value is $321,100. Housing in this ZIP code is mostly renter-occupied.
Denton County unemployment rate was 4.2 percent in August 2026, according to the Federal Reserve Bank of St. Louis. Other registered renovation projects in the area include 200 South Mill Street, Old Orchard Village East, and QuikTrip # 941. The TDLR status for Marshall Durham Middle School is Inspection Complete.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75067 (Lewisville)
One email per change. Unsubscribe in one click. Privacy.
Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project is a Renovation/Alteration project located at 2075 EDMONDS LN, Lewisville, TX 75067 in Lewisville, Texas. The project has an estimated value of $21.0M covering 100,182 sq ft. Lewisville Independent School District is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on November 13, 2024.
Frequently Asked Questions
Is Marshall Durham Middle School open?
The TDLR record confirms construction is complete and the final TDLR accessibility inspection passed in August 2026. Third-party sources like GreatSchools describe it as a public school, but the TDLR filing only covers construction status.
Who is the owner of the project?
Lewisville Independent School District is the owner of record for the Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project.
When was the final inspection completed?
The final TDLR accessibility inspection was passed in August 2026, marking the completion of the construction phase.
Who designed the project?
VLK Architects Inc is the design firm of record for this project.
What is Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project?
Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project is a renovation/alteration project at 2075 EDMONDS LN in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing building
Is Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project open in Lewisville?
Construction on Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project located?
Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project is located at 2075 EDMONDS LN, Lewisville, TX, 75067, in Denton County.
Who is the owner or developer of Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project?
Lewisville Independent School District is the property owner/developer of record for Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project, per its TDLR project registration.
Who is the architect or design firm for Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project?
VLK Architects Inc is the design firm of record for Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project, according to its TDLR filing.
How much does Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project cost and how big is it?
Marshall Durham Middle School 20-Year Life Cycle Maintenance and Repair Project has an estimated construction value of $21.0M and approximately 100,182 square feet (about $210/sqft), based on its TDLR filing.
Scope of Work
Renovations to existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2075 EDMONDS LN, Lewisville, TX, 75067
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.11B totalWatch all construction in 75067 (Lewisville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lewisville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.