Project intelligenceTDLR TABS2025005662New Construction
Funding type

This project is privately funded, on private land for private use.

Firestone Complete Auto Care in Red Oak, TX

E. Ovilla Rd, Red Oak, TX, 75154

Target date passed (Dec 2025)Review Complete

Firestone Complete Auto Care is a new construction project at E. Ovilla Rd, Red Oak, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 6,607 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,607 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$378/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 15, 2024381 days across supplied datesDec 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    106 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    275 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Firestone Complete Auto Care

A ground-up construction project for a new Firestone Complete Auto Care facility is registered at E. Ovilla Rd in Red Oak, Texas. The filing identifies the scope as a 6,607 square foot facility with an estimated cost of $2,500,000. The owner of record is FCAC - Red Oak, LLC, and the design firm is SGA Design Group, P.C.

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in November 2024. Plan review was completed in the same month. Construction was scheduled to begin in March 2025, with a completion date listed as December 2025. The TDLR status is Review Complete, and the agency has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Project Economics and Context

The estimated cost of $2,500,000 places this project above the median estimated cost for new construction filings in Ellis County, which is $900,000. The cost per square foot is $378, which is above the county median of $148 per square foot. The scheduled build window of 275 days is close to the county median of 244 days.

SGA Design Group, P.C. is the registered design firm for this project. The firm has six other TDLR-registered projects totaling $6,220,000, including an ALDI store in Anna and a Walmart project in El Paso. The area around E. Ovilla Rd includes other registered construction projects, such as a 7-Eleven and several new construction buildings. The ZIP code 75154 has a population of about 50,178 people, with a median household income of $96,150 according to U.S. Census estimates.

The project is privately funded on private land for private use. The registered accessibility specialist for the filing is Landy Perkins. Construction status is distinct from business operations, and the public record does not confirm whether the facility is open to the public.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75154 (Red Oak)

One email per change. Unsubscribe in one click. Privacy.

Firestone Complete Auto Care is a New Construction project located at E. Ovilla Rd, Red Oak, TX 75154 in Red Oak, Texas. The project has an estimated value of $2.5M covering 6,607 sq ft. FCAC - Red Oak, LLC is the property owner and SGA Design Group, P.C. is the design firm of record. The project was registered with TDLR on November 15, 2024.

Frequently Asked Questions

Is Firestone Complete Auto Care in Red Oak open?

The TDLR record shows construction was scheduled to finish in December 2025 but has not yet recorded a final inspection. Third-party listings show a different address at 100 S Austin Blvd, but the construction record for this site does not confirm operational status.

Who is building the new Firestone facility?

The owner of record is FCAC - Red Oak, LLC. The design firm is SGA Design Group, P.C., and the registered accessibility specialist is Landy Perkins.

How much does the project cost?

The estimated cost is $2,500,000. This is above the Ellis County median for new construction, which is $900,000.

When was the project registered with TDLR?

The project was registered with TDLR in November 2024. Plan review was also completed in November 2024.

What is Firestone Complete Auto Care?

Firestone Complete Auto Care is a new construction project at E. Ovilla Rd in Red Oak, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A ground-up construction of a 6,607 SF Firestone Complete Auto Care Facility.

Is Firestone Complete Auto Care open in Red Oak?

Firestone Complete Auto Care was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Firestone Complete Auto Care located?

Firestone Complete Auto Care is located at E. Ovilla Rd, Red Oak, TX, 75154, in Ellis County.

Who is the owner or developer of Firestone Complete Auto Care?

FCAC - Red Oak, LLC is the property owner/developer of record for Firestone Complete Auto Care, per its TDLR project registration.

Who is the architect or design firm for Firestone Complete Auto Care?

SGA Design Group, P.C. is the design firm of record for Firestone Complete Auto Care, according to its TDLR filing.

How much does Firestone Complete Auto Care cost and how big is it?

Firestone Complete Auto Care has an estimated construction value of $2.5M and approximately 6,607 square feet (about $378/sqft), based on its TDLR filing.

Scope of Work

A ground-up construction of a 6,607 SF Firestone Complete Auto Care Facility.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

E. Ovilla Rd, Red Oak, TX, 75154

Loading location map…
32.33478, -96.79202

Watch all construction in 75154 (Red Oak)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.