Design of the Controlled Vestibules at Dalton Elementary in Uvalde, TX
600 North Fourth Street, Uvalde, TX, 78801
Design of the Controlled Vestibules at Dalton Elementary is a renovation/alteration project at 600 North Fourth Street, Uvalde, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $406K across about 350 sq ft.
- Estimated project value
- $406K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 350 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.16K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
58 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
228 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
126 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Design of the Controlled Vestibules at Dalton Elementary
The security vestibule renovation at Dalton Elementary in Uvalde is complete. The project passed its final TDLR accessibility inspection in January 2026, confirming that construction is finished. This renovation added a controlled vestibule at the main entrance of the school located at 600 North Fourth Street.
Uvalde Consolidated Independent School District is the owner of record for this $406,000 project. The scope of work involved a renovation and alteration to add 350 square feet of new secure entry space. The estimated cost works out to $1,160 per square foot, a figure that is above the county median for similar renovation and alteration filings in Uvalde County.
Project Details and Timeline
PBK Architects served as the design firm of record. Jessica Trevino Hamm is the registered accessibility specialist listed on the filing. The project was registered with TDLR in November 2024, with plan review completed in the same month. Construction began in January 2025. The scheduled build window was 228 days, which is longer than the 153-day median for comparable projects in the county.
The project utilizes public funds. Uvalde Consolidated Independent School District has five other TDLR-registered projects totaling $1,905,000, including renovations at Batesville School and Morales Junior High School. PBK Architects has six other registered projects totaling $118,327,737, including major facilities in Katy and Houston.
Other registered projects in the immediate area include new construction for Uvalde Memorial Hospital and a rural health clinic. The surrounding ZIP code 78801 has a Census-estimated population of about 21,487. The median household income for this area is $58,028. Most housing in the zone is owner-occupied, with a median home value of $144,100.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78801 (Uvalde)
One email per change. Unsubscribe in one click. Privacy.
Design of the Controlled Vestibules at Dalton Elementary is a Renovation/Alteration project located at 600 North Fourth Street, Uvalde, TX 78801 in Uvalde, Texas. The project has an estimated value of $406K covering 350 sq ft. Uvalde Consolidated Independent School District is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on November 18, 2024.
Frequently Asked Questions
Is Dalton Elementary open?
The TDLR record confirms construction is complete following the final TDLR accessibility inspection in January 2026. The record does not contain specific business operating hours or public opening dates.
What was the cost of the vestibule project?
The estimated cost for the security vestibule addition was $406,000. This figure is above the median estimated cost of $265,000 for similar renovation projects in Uvalde County.
Who designed the security vestibule?
PBK Architects is the design firm of record. Jessica Trevino Hamm is listed as the registered accessibility specialist for the project filed with TDLR.
When was the construction finished?
Construction started in January 2025. The project passed its final TDLR accessibility inspection in January 2026, marking the completion of the work.
What is Design of the Controlled Vestibules at Dalton Elementary?
Design of the Controlled Vestibules at Dalton Elementary is a renovation/alteration project at 600 North Fourth Street in Uvalde, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of a security vestibule at main entrance
Is Design of the Controlled Vestibules at Dalton Elementary open in Uvalde?
Construction on Design of the Controlled Vestibules at Dalton Elementary is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Design of the Controlled Vestibules at Dalton Elementary located?
Design of the Controlled Vestibules at Dalton Elementary is located at 600 North Fourth Street, Uvalde, TX, 78801, in Uvalde County.
Who is the owner or developer of Design of the Controlled Vestibules at Dalton Elementary?
Uvalde Consolidated Independent School District is the property owner/developer of record for Design of the Controlled Vestibules at Dalton Elementary, per its TDLR project registration.
Who is the architect or design firm for Design of the Controlled Vestibules at Dalton Elementary?
PBK Architects is the design firm of record for Design of the Controlled Vestibules at Dalton Elementary, according to its TDLR filing.
How much does Design of the Controlled Vestibules at Dalton Elementary cost and how big is it?
Design of the Controlled Vestibules at Dalton Elementary has an estimated construction value of $406K and approximately 350 square feet (about $1.16K/sqft), based on its TDLR filing.
Scope of Work
Addition of a security vestibule at main entrance
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
600 North Fourth Street, Uvalde, TX, 78801
Related Projects
Same Owner
$2.9M totalNearby Projects
Within 0.6 miWatch all construction in 78801 (Uvalde)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Uvalde?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.