Project intelligenceTDLR TABS2025005958Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Dale B Davis Elementary School - Package 2

3205 Dorchester Dr, Carrollton, TX, 75007

Construction complete · Aug 2026Inspection Complete

Dale B Davis Elementary School - Package 2 is a renovation/alteration project at 3205 Dorchester Dr, Carrollton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $3.4M across about 6,250 sq ft.

Estimated project value
$3.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$539/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 19, 2024624 days across supplied datesAug 5, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    102 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    203 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    319 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75007 (Carrollton)

One email per change. Unsubscribe in one click. Privacy.

Dale B Davis Elementary School - Package 2 is a Renovation/Alteration project located at 3205 Dorchester Dr,, Carrollton, TX 75007 in Carrollton, Texas. The project has an estimated value of $3.4M covering 6,250 sq ft. Carrollton-Farmer's Branch ISD is the property owner and DLR Group in of Texas is the design firm of record. The project was registered with TDLR on November 19, 2024.

Frequently Asked Questions

What is Dale B Davis Elementary School - Package 2?

Dale B Davis Elementary School - Package 2 is a renovation/alteration project at 3205 Dorchester Dr in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 6250 SF interior renovation of a sped suite and new playground area. Renovation scope also includes refresh of music and arts department, and alternate to replace HVAC fan units.

Is Dale B Davis Elementary School - Package 2 open in Carrollton?

Construction on Dale B Davis Elementary School - Package 2 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Dale B Davis Elementary School - Package 2 located?

Dale B Davis Elementary School - Package 2 is located at 3205 Dorchester Dr, Carrollton, TX, 75007, in Denton County.

Who is the owner or developer of Dale B Davis Elementary School - Package 2?

Carrollton-Farmer's Branch ISD is the property owner/developer of record for Dale B Davis Elementary School - Package 2, per its TDLR project registration.

Who is the architect or design firm for Dale B Davis Elementary School - Package 2?

DLR Group in of Texas is the design firm of record for Dale B Davis Elementary School - Package 2, according to its TDLR filing.

How much does Dale B Davis Elementary School - Package 2 cost and how big is it?

Dale B Davis Elementary School - Package 2 has an estimated construction value of $3.4M and approximately 6,250 square feet (about $539/sqft), based on its TDLR filing.

Scope of Work

A 6250 SF interior renovation of a sped suite and new playground area. Renovation scope also includes refresh of music and arts department, and alternate to replace HVAC fan units.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3205 Dorchester Dr, Carrollton, TX, 75007

Location by street address

Watch all construction in 75007 (Carrollton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Carrollton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.