SISD - Security Fencing - Socorro High School is a additions to existing building project at 10150 Alameda Ave., Socorro, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $100K across about 726 sq ft.
- Estimated project value
- $100K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 726 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $138/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
69 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
331 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
275 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SISD - Security Fencing - Socorro High School
SISD - Security Fencing - Socorro High School involved the installation of security chain-link fencing and gates at 10150 Alameda Ave. in Socorro, Texas. This addition to the existing building structure covered 726 square feet with an estimated cost of $100,000. The project focused on perimeter security measures for the campus located in El Paso County.
Design and Scope
MNK Architects served as the design firm of record for this filing. The work utilized chain-link materials and gate systems to enhance the school's physical boundaries. This scope is distinct from interior renovations or structural expansions, targeting external safety measures for the facility.
Timeline and Status
Construction began in February 2025, following the project's registration with TDLR in November 2024. The scheduled completion date was December 2025. Final inspection passed in December 2025, confirming the work met required standards. TDLR closed the project file in October 2026, marking the end of the accessibility review process for this construction.
The project utilized public funds and was conducted on public land. With a cost of $100,000, the investment was below the median estimated cost for similar additions in El Paso County, which stands at $250,000. The cost per square foot was $138, slightly above the county median of $113 for comparable projects. The scheduled build window spanned 331 days, which is longer than the county median of 183 days for additions to existing buildings.
Socorro ISD has registered six other TDLR projects totaling $460,000, including work at H.D. Hilley Elementary School and Robert Rojas Elementary School, all of which are closed. MNK Architects has designed several other projects in the region, including the University Medical Center East Clinic and Socorro Middle School, demonstrating a consistent presence in local infrastructure and educational facility improvements.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79927 (Socorro)
One email per change. Unsubscribe in one click. Privacy.
SISD - Security Fencing - Socorro High School is a Additions to Existing Building project located at 10150 Alameda Ave., Socorro, TX 79927 in Socorro, Texas. The project has an estimated value of $100K covering 726 sq ft. SOCORRO INDEPENDENT SCHOOL DIST is the property owner and MNK Architects is the design firm of record. The project was registered with TDLR on November 26, 2024.
Frequently Asked Questions
What work was done at Socorro High School?
The project involved adding security chain-link fencing and gates to the existing school building. This was classified as an addition to the existing structure, focusing on perimeter security rather than interior renovation.
Who owned and designed the project?
The owner of record was Socorro Independent School District. MNK Architects was the design firm of record responsible for the project plans and specifications submitted to TDLR.
Is the project finished?
Yes, the project is finished. Final inspection passed in December 2025, and TDLR closed the project file in October 2026, confirming the completion of the accessibility review process.
How much did the fencing cost?
The estimated cost for the security fencing and gates was $100,000. This covered 726 square feet of new installation, resulting in a cost of $138 per square foot.
When did construction start and end?
Construction started in February 2025. The scheduled completion date was December 2025, and final inspection passed in that same month, leading to the project file closure in October 2026.
What is SISD - Security Fencing - Socorro High School?
SISD - Security Fencing - Socorro High School is a additions to existing building project at 10150 Alameda Ave. in Socorro, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Security chain link fencing and gates.
Is SISD - Security Fencing - Socorro High School open in Socorro?
Construction on SISD - Security Fencing - Socorro High School is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is SISD - Security Fencing - Socorro High School located?
SISD - Security Fencing - Socorro High School is located at 10150 Alameda Ave., Socorro, TX, 79927, in El Paso County.
Who is the owner or developer of SISD - Security Fencing - Socorro High School?
SOCORRO INDEPENDENT SCHOOL DIST is the property owner/developer of record for SISD - Security Fencing - Socorro High School, per its TDLR project registration.
Who is the architect or design firm for SISD - Security Fencing - Socorro High School?
MNK Architects is the design firm of record for SISD - Security Fencing - Socorro High School, according to its TDLR filing.
How much does SISD - Security Fencing - Socorro High School cost and how big is it?
SISD - Security Fencing - Socorro High School has an estimated construction value of $100K and approximately 726 square feet (about $138/sqft), based on its TDLR filing.
Scope of Work
Security chain link fencing and gates.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
10150 Alameda Ave., Socorro, TX, 79927
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$38.4M totalWatch all construction in 79927 (Socorro)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Socorro?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.