Design review complete, construction may proceed
The Grove Church Phase Two is a Additions to Existing Building project located at 23911 Ronald Reagan Blvd., Liberty Hill, TX 78642 in Liberty Hill, Texas. The project has an estimated value of $10.5M covering 47,659 sq ft. Scott Heider is the property owner and Spencer-Pierce Architecture + Interiors, Inc. is the design firm of record. The project was registered with TDLR on December 2, 2024.
The Grove Church Phase Two is a additions to existing building project at 23911 Ronald Reagan Blvd., Liberty Hill, TX 78642 in Liberty Hill, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition to existing building. Modifications to existing restrooms plus a new two story building adjacent to the existing building. The new 2nd floor space to be unoccupied and unfinished shell space.
The Grove Church Phase Two is currently under construction in Liberty Hill, TX. Its current TDLR status is "Review Complete".
The Grove Church Phase Two is located at 23911 Ronald Reagan Blvd., Liberty Hill, TX 78642, Liberty Hill, TX, 78642, in Williamson County.
Scott Heider is the property owner/developer of record for The Grove Church Phase Two, per its TDLR project registration.
Spencer-Pierce Architecture + Interiors, Inc. is the design firm of record for The Grove Church Phase Two, according to its TDLR filing.
The Grove Church Phase Two has an estimated construction value of $10.5M and approximately 47,659 square feet (about $220/sqft), based on its TDLR filing.
Addition to existing building. Modifications to existing restrooms plus a new two story building adjacent to the existing building. The new 2nd floor space to be unoccupied and unfinished shell space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 2, 2024
Review Complete
Dec 2, 2024
Inspection Complete
Closed