Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
US 90A (CSJ: 0027-08-147) in Richmond, TX
From: FM 359 To: SH 99, Richmond, TX, 77406
US 90A (CSJ: 0027-08-147) is a new construction project at From: FM 359 To: SH 99, Richmond, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $62.2M across about 138,616 sq ft.
- Estimated project value
- $62.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 138,616 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $449/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
211 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
853 days after the preceding date shown.
Source: TDLR filing
View source record
📰About US 90A (CSJ: 0027-08-147)
TxDOT District: Houston is reconstructing and widening US 90A in Richmond, Texas, a project filed as CSJ: 0027-08-147. This new construction initiative transforms the roadway from a 4-lane to a 6-lane divided highway between FM 359 and SH 99 in Fort Bend County. The scope includes building drainage cross culverts, storm sewers, a detention pond, and a Shared Use Path, with an estimated cost of $62,218,200.
Project Scope and Design
Consor Engineers, LLC serves as the design firm of record for this infrastructure upgrade. The project covers 138,616 sq ft, resulting in a computed cost of $449 per square foot. This figure is above the county median of $100 per square foot for new construction filings in Fort Bend County. The estimated total cost is also above the county median for its type, placing it in the top quarter of similar recent registrations.
Timeline and Regulatory Status
The project registered with TDLR in December 2024, and plan review was completed in the same month. Construction is scheduled to start in July 2025 and is scheduled to finish in November 2027. This 853-day build window is longer than the county median of 201 days for comparable new construction projects. TDLR status is Review Complete.
TxDOT District: Houston holds six other TDLR-registered projects totaling $427,491,389, including work in Houston, Katy, and Galveston. Consor Engineers, LLC has six other registered projects across Texas totaling $122,039,499, with recent work in Amarillo, El Paso, and Fort Worth. The project involves public funds and is a Federally funded roadway project.
The area around the site includes businesses such as Valiant Martial Arts and Drabek Farms. Census estimates for ZIP code 77406 indicate a population of about 65,716 and a median household income of $143,023. The median owner-occupied home value is $383,400, with housing predominantly owner-occupied. Fort Bend County unemployment rate was 5.1 percent in June 2026.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77406 (Richmond)
One email per change. Unsubscribe in one click. Privacy.
US 90A (CSJ: 0027-08-147) is a New Construction project located at From: FM 359 To: SH 99, Richmond, TX 77406 in Richmond, Texas. The project has an estimated value of $62.2M covering 138,616 sq ft. TxDOT District: Houston is the property owner and Consor Engineers, LLC is the design firm of record. The project was registered with TDLR on December 2, 2024.
Frequently Asked Questions
When is construction scheduled to finish?
Construction is scheduled to finish in November 2027, with work starting in July 2025. TDLR completed plan review in December 2024.
Who is the owner of this project?
TxDOT District: Houston is the owner of record for this US 90A reconstruction project in Richmond, Texas.
What is the estimated cost of the project?
The estimated cost is $62,218,200. This is above the county median for new construction in Fort Bend County.
What changes are being made to the roadway?
The project reconstructs and widens US 90A from 4 to 6 lanes, adding drainage, storm sewers, a detention pond, and a Shared Use Path.
Is the business open?
The TDLR record tracks construction status, not business operations. Construction is scheduled to finish in November 2027.
What is US 90A (CSJ: 0027-08-147)?
US 90A (CSJ: 0027-08-147) is a new construction project at From: FM 359 To: SH 99 in Richmond, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen from 4 to 6 lane divided roadway. Construct drainage cross culverts, storm sewer, detention pond and Shared Use Path (SUP).
Is US 90A (CSJ: 0027-08-147) open in Richmond?
US 90A (CSJ: 0027-08-147) is still under construction in Richmond, TX, with an estimated completion of Nov 2027 according to its TDLR registration.
Where is US 90A (CSJ: 0027-08-147) located?
US 90A (CSJ: 0027-08-147) is located at From: FM 359 To: SH 99, Richmond, TX, 77406, in Fort Bend County.
Who is the owner or developer of US 90A (CSJ: 0027-08-147)?
TxDOT District: Houston is the property owner/developer of record for US 90A (CSJ: 0027-08-147), per its TDLR project registration.
Who is the architect or design firm for US 90A (CSJ: 0027-08-147)?
Consor Engineers, LLC is the design firm of record for US 90A (CSJ: 0027-08-147), according to its TDLR filing.
How much does US 90A (CSJ: 0027-08-147) cost and how big is it?
US 90A (CSJ: 0027-08-147) has an estimated construction value of $62.2M and approximately 138,616 square feet (about $449/sqft), based on its TDLR filing.
Scope of Work
Reconstruct and widen from 4 to 6 lane divided roadway. Construct drainage cross culverts, storm sewer, detention pond and Shared Use Path (SUP).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: FM 359 To: SH 99, Richmond, TX, 77406
Related Projects
Same Owner
$37.03B totalWatch all construction in 77406 (Richmond)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Richmond?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.