Project intelligenceTDLR TABS2025006696Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

BOBA BARN in Seguin, TX

E. College St., Seguin, TX, 78155

Target date passed (Sep 2025)Review Complete

BOBA BARN is a additions to existing building project at E. College St., Seguin, in Guadalupe County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $400K across about 480 sq ft.

Estimated project value
$400K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
480 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$833/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 3, 2024272 days across supplied datesSep 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    243 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About BOBA BARN

Boba Barn is a 480 sq ft addition to an existing building located at E. College St. in Seguin, Texas. The project, registered with TDLR in December 2024, includes drive-through and parking space improvements with an estimated cost of $400,000. Construction was scheduled to begin in January 2025 and finish by September 2025, though TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

The owner of record is Al Burns, who also holds registration for Sprouts Learning Academy in Seguin. The design firm of record is Laijas Project Resource Group, which has six other TDLR-registered projects totaling $7,050,000 across Pleasanton, Seguin, and New Braunfels. The registered accessibility specialist for this filing is Robert V Buck. The project is privately funded on private land for private use.

Project Scope and Cost Context

The filing specifies 480 sq ft of building space with drive-through and parking space. The estimated cost of $400,000 translates to $833 per square foot. In Guadalupe County, the median estimated cost for additions to existing buildings is $750,000, with a median size of 5,250 sq ft and a median cost of $171 per square foot. This project's cost is below the county median, while its per-square-foot cost is above the county median. The scheduled build window of 243 days is close to the county median of 196 days.

Census estimates for ZIP 78155 show a population of about 53,449, a median household income of $71,367, and a median owner-occupied home value of $246,000. The area is predominantly owner-occupied housing. Guadalupe County unemployment was 4.7 percent in June 2026, higher than a year earlier.

Local web mentions describe Boba Barn as a bubble tea and boba drink shop in Seguin. A Facebook post by gregeats.tx noted the location as a new hangout, while a Facebook page for Boba Barn Seguin lists it at 1363 E College St with hours from 7am to 7pm. These third-party descriptions are not part of the TDLR record and do not confirm current operational status or construction completion.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78155 (Seguin)

One email per change. Unsubscribe in one click. Privacy.

BOBA BARN is a Additions to Existing Building project located at E. College St., Seguin, TX 78155 in Seguin, Texas. The project has an estimated value of $400K covering 480 sq ft. Al Burns is the property owner and Laijas Project Resource Group is the design firm of record. The project was registered with TDLR on December 3, 2024.

Frequently Asked Questions

What is the construction status of Boba Barn in Seguin?

TDLR completed plan review in December 2024. Construction was scheduled to finish in September 2025. TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Who is the owner and design firm for Boba Barn?

The owner of record is Al Burns. The design firm of record is Laijas Project Resource Group. The registered accessibility specialist is Robert V Buck.

What is the estimated cost and size of the Boba Barn project?

The project includes 480 sq ft of building space with drive-through and parking. The estimated cost is $400,000, which is $833 per square foot.

Is Boba Barn open for business in Seguin?

The TDLR record does not confirm operational status. A Facebook post by gregeats.tx reported the location as a new hangout, but this is third-party information and not part of the construction record.

Where is Boba Barn located in Seguin?

The project is located at E. College St. in Seguin, Texas, in Guadalupe County.

What is BOBA BARN?

BOBA BARN is a additions to existing building project at E. College St. in Seguin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project includes 480 SF of building space with drive through and parking space

Is BOBA BARN open in Seguin?

BOBA BARN was scheduled to finish construction in Sep 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is BOBA BARN located?

BOBA BARN is located at E. College St., Seguin, TX, 78155, in Guadalupe County.

Who is the owner or developer of BOBA BARN?

Al Burns is the property owner/developer of record for BOBA BARN, per its TDLR project registration.

Who is the architect or design firm for BOBA BARN?

Laijas Project Resource Group is the design firm of record for BOBA BARN, according to its TDLR filing.

How much does BOBA BARN cost and how big is it?

BOBA BARN has an estimated construction value of $400K and approximately 480 square feet (about $833/sqft), based on its TDLR filing.

Scope of Work

This project includes 480 SF of building space with drive through and parking space

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

E. College St., Seguin, TX, 78155

Loading location map…
29.57466, -97.95381

Watch all construction in 78155 (Seguin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.