GISD Ethridge Elementary School Playground Replacement is a renovation/alteration project at 2301 Sam Houston Dr, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $419K across about 5,980 sq ft.
- Estimated project value
- $419K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,980 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $70/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
180 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
213 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
50 days after the preceding date shown.
Source: TDLR filing
View source record
📰About GISD Ethridge Elementary School Playground Replacement
The playground replacement at GISD Ethridge Elementary School in Garland is complete. The project, filed as a Renovation/Alteration, involved replacing outdoor equipment and surfaces at 2301 Sam Houston Dr. The work included new shade canopies and civil improvements such as drainage and sidewalk repairs across 5,980 sq ft of area.
Garland Independent School District served as the owner of record for this initiative. BRW Architects was the design firm of record, and Marcela Abadi Rhoads served as the registered accessibility specialist. The estimated cost for the project was $418,629, which calculates to $70 per square foot. This figure is close to the county median of $73 per square foot for similar renovation filings in Dallas County.
Project Scope and Timeline
The scope of work focused on modernizing the school's outdoor play area. The filing specified the replacement of playground equipment and surface materials. It also included the installation of a new shade canopy to provide coverage for students. Civil improvements were part of the contract, specifically addressing drainage issues and repairing sidewalks around the site.
The project registered with TDLR in December 2024. Plan review was completed in the same month. Construction was scheduled to begin in June 2025 with a completion date listed for December 2025. The scheduled build window of 213 days is longer than the county median of 92 days for comparable renovation projects. The final TDLR accessibility inspection passed in February 2026, confirming the completion of the work.
This project is one of several recent renovations for Garland Independent School District. The district has six other TDLR-registered projects totaling $152,982,134. These include major developments at Memorial Pathway Academy and Student Services Center, as well as renovations at North Garland High School and South Garland High School. BRW Architects, the design firm for Ethridge Elementary, has also completed projects in Killeen and McAllen, including a Police Headquarters and a Fleet Maintenance Building.
The location is in the 75044 ZIP code area. Census estimates for this zone indicate a population of about 46,847 people. The median household income is $89,631, and the median owner-occupied home value is $305,700. Housing in this area is mostly owner-occupied. Dallas County unemployment was 3 percent in August 2026, lower than a year earlier.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75044 (Garland)
One email per change. Unsubscribe in one click. Privacy.
GISD Ethridge Elementary School Playground Replacement is a Renovation/Alteration project located at 2301 Sam Houston Dr, Garland, TX 75044 in Garland, Texas. The project has an estimated value of $419K covering 5,980 sq ft. Garland Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on December 3, 2024.
Frequently Asked Questions
What work was done at Ethridge Elementary?
The project replaced playground equipment and surface materials. It included installing a new shade canopy. Civil improvements such as drainage and sidewalk repairs were also part of the scope.
Who is the owner of the project?
Garland Independent School District is the owner of record. BRW Architects was the design firm, and Marcela Abadi Rhoads was the registered accessibility specialist.
When did construction finish?
The final TDLR accessibility inspection passed in February 2026. Construction was scheduled to start in June 2025 and was listed for completion in December 2025.
How much did the project cost?
The estimated cost was $418,629. This amount covers 5,980 sq ft of work, resulting in a cost of $70 per square foot.
Is the school open?
The construction project is complete. The TDLR record confirms the final TDLR accessibility inspection passed in February 2026. Specific operational hours or opening status are not detailed in the filing.
What is GISD Ethridge Elementary School Playground Replacement?
GISD Ethridge Elementary School Playground Replacement is a renovation/alteration project at 2301 Sam Houston Dr in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5980 sq.ft.
Is GISD Ethridge Elementary School Playground Replacement open in Garland?
Construction on GISD Ethridge Elementary School Playground Replacement is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is GISD Ethridge Elementary School Playground Replacement located?
GISD Ethridge Elementary School Playground Replacement is located at 2301 Sam Houston Dr, Garland, TX, 75044, in Dallas County.
Who is the owner or developer of GISD Ethridge Elementary School Playground Replacement?
Garland Independent School District is the property owner/developer of record for GISD Ethridge Elementary School Playground Replacement, per its TDLR project registration.
Who is the architect or design firm for GISD Ethridge Elementary School Playground Replacement?
BRW Architects is the design firm of record for GISD Ethridge Elementary School Playground Replacement, according to its TDLR filing.
How much does GISD Ethridge Elementary School Playground Replacement cost and how big is it?
GISD Ethridge Elementary School Playground Replacement has an estimated construction value of $419K and approximately 5,980 square feet (about $70/sqft), based on its TDLR filing.
Scope of Work
Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5980 sq.ft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2301 Sam Houston Dr, Garland, TX, 75044
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$715.7M totalWatch all construction in 75044 (Garland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Garland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.