Project intelligenceTDLR TABS2025006785Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Alvin WWTP Expansion

7100 County Rd 160, Alvin, TX, 77511

Opening ~Feb 2028Review Complete

City of Alvin WWTP Expansion is a renovation/alteration project at 7100 County Rd 160, Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $410K across about 1,920 sq ft.

Estimated project value
$410K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,920 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$214/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 4, 20241,168 days across supplied datesFeb 15, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    73 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,095 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77511 (Alvin)

One email per change. Unsubscribe in one click. Privacy.

City of Alvin WWTP Expansion is a Renovation/Alteration project located at 7100 County Rd 160, Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $410K covering 1,920 sq ft. City of Alvin is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on December 4, 2024.

Frequently Asked Questions

What is City of Alvin WWTP Expansion?

City of Alvin WWTP Expansion is a renovation/alteration project at 7100 County Rd 160 in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Area of existing administration building is 1,920 sq ft. Scope of work includes installation of fire alarm system, replacing existing roof, adding a network panel, and adding computer hardware.

Is City of Alvin WWTP Expansion open in Alvin?

City of Alvin WWTP Expansion is still under construction in Alvin, TX, with an estimated completion of Feb 2028 according to its TDLR registration.

Where is City of Alvin WWTP Expansion located?

City of Alvin WWTP Expansion is located at 7100 County Rd 160, Alvin, TX, 77511, in Brazoria County.

Who is the owner or developer of City of Alvin WWTP Expansion?

City of Alvin is the property owner/developer of record for City of Alvin WWTP Expansion, per its TDLR project registration.

Who is the architect or design firm for City of Alvin WWTP Expansion?

Freese and Nichols, Inc. is the design firm of record for City of Alvin WWTP Expansion, according to its TDLR filing.

How much does City of Alvin WWTP Expansion cost and how big is it?

City of Alvin WWTP Expansion has an estimated construction value of $410K and approximately 1,920 square feet (about $214/sqft), based on its TDLR filing.

Scope of Work

Area of existing administration building is 1,920 sq ft. Scope of work includes installation of fire alarm system, replacing existing roof, adding a network panel, and adding computer hardware.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7100 County Rd 160, Alvin, TX, 77511

Location by street address

Watch all construction in 77511 (Alvin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.