Project intelligenceTDLR TABS2025006810Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

GISD Beaver ES Playground equipment replacement in Garland, TX

3232 March Ln, Garland, TX, 75044

Construction complete · Jun 2026Project Closed

GISD Beaver ES Playground equipment replacement is a renovation/alteration project at 3232 March Ln, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $449K across about 5,768 sq ft.

Estimated project value
$449K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,768 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$78/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 4, 2024563 days across supplied datesJun 20, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    179 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    213 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    120 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About GISD Beaver ES Playground equipment replacement

The renovation and alteration project at GISD Beaver Elementary School in Garland is complete. TDLR closed the project file in June 2026, which marks the end of the accessibility review process for this construction. The work involved replacing playground equipment, surfaces, and installing a new shade canopy across a 5,768 sq ft site at 3232 March Ln.

Garland Independent School District served as the owner of record for this $449,085 project. BRW Architects was the design firm of record, while Marcela Abadi Rhoads acted as the registered accessibility specialist. The scope included civil improvements such as drainage and sidewalk repairs alongside the playground upgrades. The project was registered with TDLR in December 2024, and plan review was completed in the same month.

Construction was scheduled to begin in June 2025, with a planned completion date of December 2025. The final inspection passed in February 2026, confirming the physical work was finished before the administrative closure. This timeline represents a 213-day scheduled build window, which is longer than the 92-day median for similar renovation projects in Dallas County. The estimated cost of $78 per square foot is close to the county median of $73 per square foot for renovation and alteration filings.

Project Context

This project is part of a larger portfolio of work by Garland Independent School District. The district has six other TDLR-registered projects totaling $152,982,134, including major renovations at Memorial Pathway Academy and North Garland High School. BRW Architects has also completed five other TDLR-registered projects totaling $39,882,150, ranging from police headquarters to fleet maintenance buildings in Killeen and McAllen.

The project site is located in ZIP code 75044. U.S. Census ACS 2023 five-year estimates for this area indicate a population of about 46,847 and a median household income of $89,631. The area has approximately 17,491 housing units, with a median owner-occupied home value of $305,700. Housing in this ZIP code is mostly owner-occupied. This project utilized public funds and public land, consistent with the scope of work for a public school facility.

The completion of this project adds to the infrastructure improvements in Dallas County. The district's other closed project, GISD Davis Elementary School, had an estimated cost of $381,134. The Beaver Elementary project's cost is above the county median of $250,000 for its type of work. The detailed scope and the involvement of a registered accessibility specialist ensure the new playground meets current standards for student safety and access.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75044 (Garland)

One email per change. Unsubscribe in one click. Privacy.

GISD Beaver ES Playground equipment replacement is a Renovation/Alteration project located at 3232 March Ln, Garland, TX 75044 in Garland, Texas. The project has an estimated value of $449K covering 5,768 sq ft. Garland Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on December 4, 2024.

Frequently Asked Questions

Is the playground at GISD Beaver Elementary School finished?

Yes, the final inspection passed in February 2026. TDLR closed the project file in June 2026, indicating the construction and review process is complete.

What was the estimated cost of the playground replacement?

The estimated cost for the GISD Beaver Elementary School playground equipment replacement and civil improvements was $449,085.

Who designed the new playground at Beaver Elementary?

BRW Architects was the design firm of record for the project. Marcela Abadi Rhoads served as the registered accessibility specialist.

What work was included in the project scope?

The scope included replacing playground equipment and surfaces, installing a new shade canopy, and civil improvements like drainage and sidewalk repairs.

When did construction start and end?

Construction was scheduled to start in June 2025. The final inspection passed in February 2026, and TDLR closed the file in June 2026.

What is GISD Beaver ES Playground equipment replacement?

GISD Beaver ES Playground equipment replacement is a renovation/alteration project at 3232 March Ln in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5768 sq.ft.

Is GISD Beaver ES Playground equipment replacement open in Garland?

Construction on GISD Beaver ES Playground equipment replacement is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is GISD Beaver ES Playground equipment replacement located?

GISD Beaver ES Playground equipment replacement is located at 3232 March Ln, Garland, TX, 75044, in Dallas County.

Who is the owner or developer of GISD Beaver ES Playground equipment replacement?

Garland Independent School District is the property owner/developer of record for GISD Beaver ES Playground equipment replacement, per its TDLR project registration.

Who is the architect or design firm for GISD Beaver ES Playground equipment replacement?

BRW Architects is the design firm of record for GISD Beaver ES Playground equipment replacement, according to its TDLR filing.

How much does GISD Beaver ES Playground equipment replacement cost and how big is it?

GISD Beaver ES Playground equipment replacement has an estimated construction value of $449K and approximately 5,768 square feet (about $78/sqft), based on its TDLR filing.

Scope of Work

Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5768 sq.ft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3232 March Ln, Garland, TX, 75044

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75044 (Garland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.