Project intelligenceTDLR TABS2025006817Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HaiDiLao in Austin, TX

11824 Rock Rose, Suite 160, Austin, TX, 78757

Target date passed (Nov 2026)Review Complete

HaiDiLao is a renovation/alteration project at 11824 Rock Rose, Suite 160, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 7,394 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,394 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$338/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 4, 2024697 days across supplied datesNov 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    452 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About HaiDiLao

HaiDiLao Austin, a $2,500,000 interior finish-out for a 7,394-square-foot Chinese hot pot restaurant, is registered with the Texas Department of Licensing and Regulation (TDLR) for accessibility compliance. The project is located at 11824 Rock Rose, Suite 160, in the North Burnet area of Austin, Travis County. Northwood Retail LLC is the owner of record, while Develop Inc Architectural serves as the design firm. Robert Ronson is the registered accessibility specialist overseeing the work. The filing indicates the project involves public funds or public land.

Project Scope and Timeline

Construction is scheduled to finish in November 2026, with work starting March 2026. TDLR completed the plan review in December 2024, and the current status is Review Complete. The estimated cost of $2,500,000 results in a cost per square foot of $338. This budget is significantly higher than the median for similar renovation and alteration projects in Travis County, which stands at $104 per square foot. The scheduled build window of 245 days is also longer than the county median of 98 days.

Owner and Market Context

Northwood Retail LLC has six other TDLR-registered projects totaling $2,235,000, primarily at Domain Northside in Austin. Develop Inc Architectural has six other registered projects totaling $1,053,500, including work in Fairview, Dallas, McKinney, and Frisco. The site is situated near several established businesses, including Topgolf Austin, Apple Domain NORTHSIDE, Aloft by Marriott Austin at The Domain, California Closets, Griffis at The Domain, and J.Crew. According to U.S. Census ACS 2023 five-year estimates for ZIP code 78757, the area has a population of about 24,327 and a median household income of $104,946.

Local media coverage has highlighted the development. A post by hoodline.com described the project as "Sizzling Hot Pot Heads To Rock Rose As Haidilao Lines Up Domain," identifying HaiDiLao Hot Pot Austin Inc. as the facility and Lin Peng as the tenant on the permit. The site is outside the FEMA Special Flood Hazard Area (zone X). Travis County unemployment rate (FRED, September 2026): 3.6 percent, lower than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78757 (Austin)

One email per change. Unsubscribe in one click. Privacy.

HaiDiLao is a Renovation/Alteration project located at 11824 Rock Rose, Suite 160, Austin, TX 78757 in Austin, Texas. The project has an estimated value of $2.5M covering 7,394 sq ft. Northwood Retail LLC is the property owner and Develop Inc Architectural is the design firm of record. The project was registered with TDLR on December 4, 2024.

Frequently Asked Questions

Is the HaiDiLao Austin location open yet?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is scheduled to finish in November 2026.

Who is the design firm for this project?

Develop Inc Architectural is the design firm of record for the HaiDiLao Austin renovation.

Where is the project located?

The project is at 11824 Rock Rose, Suite 160, Austin, TX 78757.

What is HaiDiLao?

HaiDiLao is a renovation/alteration project at 11824 Rock Rose, Suite 160 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of 7,394 sf restaurant serving Chinese hot pot cuisine

Is HaiDiLao open in Austin?

HaiDiLao was scheduled to finish construction in Nov 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is HaiDiLao located?

HaiDiLao is located at 11824 Rock Rose, Suite 160, Austin, TX, 78757, in Travis County.

Who is the owner or developer of HaiDiLao?

Northwood Retail LLC is the property owner/developer of record for HaiDiLao, per its TDLR project registration.

Who is the architect or design firm for HaiDiLao?

Develop Inc Architectural is the design firm of record for HaiDiLao, according to its TDLR filing.

How much does HaiDiLao cost and how big is it?

HaiDiLao has an estimated construction value of $2.5M and approximately 7,394 square feet (about $338/sqft), based on its TDLR filing.

Scope of Work

Interior finish out of 7,394 sf restaurant serving Chinese hot pot cuisine

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

11824 Rock Rose, Suite 160, Austin, TX, 78757

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

11824 DUNFRIES LN

50ft sewer line repair

FinalPlumbing PermitRepairMar 2025
View Details
2025-028292 PP
11824 EUBANK DR

Break the needed concrete in the bathroom to install the new plumbing for the freestanding tub shower and also to move the vent. we will need to install new water lines as well as new venting for the new fixtures. price will include setting sand into the trenches when done we will not replace the concrete in the bathroom.

ExpiredPlumbing PermitRepairApr 2023
View Details
2023-047924 PP
11824 DUNFRIES LN

Replacement of an existing water heater

FinalPlumbing PermitChange OutFeb 2023
View Details
2023-020918 PP
NEW ABACUS, LLC
11824 DUNFRIES LN

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutJan 2023
View Details
2022-184549 MP
11824 DUNFRIES LN

Express: Foundation Repair

FinalBuilding PermitRepairNov 2022
$1
View Details
2022-172447 BP
Bats Foundation Repair

Watch all construction in 78757 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.