GISD Shorehaven Elementary School Playground Replacement in Garland, TX
600 Shorehaven Dr, Garland, TX, 75042
GISD Shorehaven Elementary School Playground Replacement is a renovation/alteration project at 600 Shorehaven Dr, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $437K across about 5,050 sq ft.
- Estimated project value
- $437K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,050 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $87/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
179 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
213 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
44 days after the preceding date shown.
Source: TDLR filing
View source record
📰About GISD Shorehaven Elementary School Playground Replacement
GISD Shorehaven Elementary School in Garland, Texas, has completed its playground renovation. The project, filed as the GISD Shorehaven Elementary School Playground Replacement, replaced existing playground equipment and surface materials and added a new shade canopy. The work also included civil improvements such as drainage updates and sidewalk repairs across 5,050 sq ft of site area.
Garland Independent School District is the owner of record for this renovation. BRW Architects served as the design firm, while Marcela Abadi Rhoads was the registered accessibility specialist. The project was registered with TDLR in December 2024, and plan review was completed in the same month. Construction began in June 2025, with a scheduled completion date of December 2025.
Project Scope and Cost
The estimated cost for the project was $437,071. This translates to $87 per square foot. The scope involved replacing playground equipment and surface materials, installing a new shade canopy, and performing civil improvements including drainage and sidewalk repairs. The total area affected was 5,050 sq ft.
For context, the median estimated cost for renovation/alteration projects in Dallas County is $250,000. This project’s cost is above the county median. The median size for such projects is 4,218 sq ft, and this project’s 5,050 sq ft is slightly larger. The median cost per square foot is $73, making this project’s $87 per square foot above the county median.
Completion and Inspection
The project passed its final TDLR accessibility inspection in February 2026. The TDLR status is listed as Inspection Complete. This confirms that construction is complete and the project has met accessibility standards. The scheduled build window was 213 days, which is longer than the county median of 92 days for similar projects.
Garland Independent School District has six other TDLR-registered projects totaling $152,982,134. BRW Architects has six other TDLR-registered projects totaling $39,882,150. The area profile for ZIP 75042 shows a population of about 38,040, a median household income of $63,531, and a median owner-occupied home value of $221,300.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75042 (Garland)
One email per change. Unsubscribe in one click. Privacy.
GISD Shorehaven Elementary School Playground Replacement is a Renovation/Alteration project located at 600 Shorehaven Dr, Garland, TX 75042 in Garland, Texas. The project has an estimated value of $437K covering 5,050 sq ft. Garland Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on December 4, 2024.
Frequently Asked Questions
Is GISD Shorehaven Elementary School open?
The construction project is complete. The final TDLR accessibility inspection passed in February 2026. The TDLR record confirms construction is finished, but does not specify the school's operational status.
What was the cost of the playground renovation?
The estimated cost was $437,071. This translates to $87 per square foot for the 5,050 sq ft project area. The cost is above the Dallas County median of $73 per square foot.
Who designed the playground project?
BRW Architects was the design firm of record. Marcela Abadi Rhoads was the registered accessibility specialist. Garland Independent School District is the owner of record.
When did construction finish?
Construction was scheduled to complete in December 2025. The final TDLR accessibility inspection passed in February 2026, confirming the project is complete.
What improvements were made?
The project replaced playground equipment and surface materials, added a new shade canopy, and included civil improvements like drainage and sidewalk repairs across 5,050 sq ft.
What is GISD Shorehaven Elementary School Playground Replacement?
GISD Shorehaven Elementary School Playground Replacement is a renovation/alteration project at 600 Shorehaven Dr in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5050 sq.ft.
Is GISD Shorehaven Elementary School Playground Replacement open in Garland?
Construction on GISD Shorehaven Elementary School Playground Replacement is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is GISD Shorehaven Elementary School Playground Replacement located?
GISD Shorehaven Elementary School Playground Replacement is located at 600 Shorehaven Dr, Garland, TX, 75042, in Dallas County.
Who is the owner or developer of GISD Shorehaven Elementary School Playground Replacement?
Garland Independent School District is the property owner/developer of record for GISD Shorehaven Elementary School Playground Replacement, per its TDLR project registration.
Who is the architect or design firm for GISD Shorehaven Elementary School Playground Replacement?
BRW Architects is the design firm of record for GISD Shorehaven Elementary School Playground Replacement, according to its TDLR filing.
How much does GISD Shorehaven Elementary School Playground Replacement cost and how big is it?
GISD Shorehaven Elementary School Playground Replacement has an estimated construction value of $437K and approximately 5,050 square feet (about $87/sqft), based on its TDLR filing.
Scope of Work
Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5050 sq.ft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
600 Shorehaven Dr, Garland, TX, 75042
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$715.7M totalWatch all construction in 75042 (Garland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Garland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.