Project intelligenceTDLR TABS2025006828Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

GISD Caldwell ES Playground Replacement in Garland, TX

3400 Saturn Rd, Garland, TX, 75042

Construction complete · Jun 2026Project Closed

GISD Caldwell ES Playground Replacement is a renovation/alteration project at 3400 Saturn Rd, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $426K across about 5,200 sq ft.

Estimated project value
$426K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$82/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 4, 2024544 days across supplied datesJun 1, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    179 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    213 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    110 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About GISD Caldwell ES Playground Replacement

The playground replacement at GISD Caldwell Elementary School in Garland is complete. The project, filed with the Texas Department of Licensing and Regulatory Affairs (TDLR) as a renovation and alteration, involved the replacement of playground equipment, surfacing, and the installation of a new shade canopy. Civil improvements included drainage upgrades and sidewalk repairs across a 5,200 square foot area.

Located at 3400 Saturn Rd in Dallas County, the work was executed for the Garland Independent School District. The estimated cost for this specific scope was $425,830. This figure places the project above the median estimated cost of $250,000 for renovation and alteration filings in the county during the same period. The calculated cost per square foot was $82, which is close to the county median of $73 per square foot.

BRW Architects served as the design firm of record for the project. Marcela Abadi Rhoads was the registered accessibility specialist associated with the filing. The project involved public funds and public land. The TDLR registration and plan review were completed in December 2024. Construction was scheduled to begin in June 2025, with a planned completion date of December 2025.

The scheduled build window for this project was 213 days. This duration is longer than the median scheduled build window of 92 days for similar renovation and alteration projects in Dallas County. The final inspection for the project passed in February 2026. Following the successful inspection, TDLR closed the project file in June 2026, which marks the end of the accessibility review process for this construction.

Garland Independent School District has six other TDLR-registered projects totaling $152,982,134. These include significant developments such as the Memorial Pathway Academy and Student Services Center. BRW Architects has also worked on six other TDLR-registered projects totaling $39,882,150. These projects span various locations, including Huffman Elementary School in Huffman and facilities in Killeen.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75042 (Garland)

One email per change. Unsubscribe in one click. Privacy.

GISD Caldwell ES Playground Replacement is a Renovation/Alteration project located at 3400 Saturn Rd, Garland, TX 75042 in Garland, Texas. The project has an estimated value of $426K covering 5,200 sq ft. Garland Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on December 4, 2024.

Frequently Asked Questions

When did the playground renovation finish?

The final inspection passed in February 2026. TDLR closed the project file in June 2026, marking the end of the accessibility review process.

What specific work was done at Caldwell Elementary?

The project replaced playground equipment and surface, added a new shade canopy, and included civil improvements like drainage and sidewalk repairs.

Who was the design firm for this project?

BRW Architects was the design firm of record for the GISD Caldwell Elementary School playground replacement project.

How much did the project cost?

The estimated cost for the 5,200 square foot renovation was $425,830. This was above the county median cost for similar renovation filings.

Is the school open?

The construction record indicates the project is complete and the file is closed. The TDLR record does not provide information on the school's daily operating status.

What is GISD Caldwell ES Playground Replacement?

GISD Caldwell ES Playground Replacement is a renovation/alteration project at 3400 Saturn Rd in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5200 sq.ft.

Is GISD Caldwell ES Playground Replacement open in Garland?

Construction on GISD Caldwell ES Playground Replacement is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is GISD Caldwell ES Playground Replacement located?

GISD Caldwell ES Playground Replacement is located at 3400 Saturn Rd, Garland, TX, 75042, in Dallas County.

Who is the owner or developer of GISD Caldwell ES Playground Replacement?

Garland Independent School District is the property owner/developer of record for GISD Caldwell ES Playground Replacement, per its TDLR project registration.

Who is the architect or design firm for GISD Caldwell ES Playground Replacement?

BRW Architects is the design firm of record for GISD Caldwell ES Playground Replacement, according to its TDLR filing.

How much does GISD Caldwell ES Playground Replacement cost and how big is it?

GISD Caldwell ES Playground Replacement has an estimated construction value of $426K and approximately 5,200 square feet (about $82/sqft), based on its TDLR filing.

Scope of Work

Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5200 sq.ft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3400 Saturn Rd, Garland, TX, 75042

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75042 (Garland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.