Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
GISD Handley ES Playground Replacement in Garland, TX
3725 Broadway Blvd, Garland, TX, 75042
GISD Handley ES Playground Replacement is a renovation/alteration project at 3725 Broadway Blvd, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $453K across about 4,910 sq ft.
- Estimated project value
- $453K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,910 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $92/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
179 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
213 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
49 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
122 days after the preceding date shown.
Source: TDLR filing
View source record
📰About GISD Handley ES Playground Replacement
GISD Handley Elementary School completed the playground replacement project at 3725 Broadway Blvd in Garland in early 2026. The renovation/alteration work, filed as GISD Handley ES Playground Replacement, involved replacing playground equipment and surfaces and installing a new shade canopy across 4,910 sq ft of site improvements.
The project was owned by Garland Independent School District and designed by BRW Architects. The scope included civil improvements such as drainage updates and sidewalk repairs. The estimated cost for the work was $452,879, which translates to a cost of $92 per square foot.
Project Timeline and Status
Plan review was completed in December 2024, shortly after the project was registered with TDLR. Construction was scheduled to begin in June 2025, with a planned completion date of December 2025. The final inspection was successfully passed in February 2026, confirming that the work met the required accessibility standards.
In June 2026, TDLR closed the project file, marking the official end of the accessibility review process for this construction. The project is now listed as Project Closed in the TDLR records, indicating that all regulatory requirements for the accessibility review have been satisfied.
Context and Comparison
This project’s estimated cost of $452,879 is above the median estimated cost of $250,000 for renovation/alteration filings in Dallas County. The scheduled build window of 213 days is longer than the county median of 92 days. The cost per square foot of $92 is also above the county median of $73. These figures are computed from 32,665 TDLR-registered renovation/alteration filings in Dallas County, with 4,387 registered in the last 24 months.
Garland Independent School District has six other TDLR-registered projects totaling $152,982,134, including Memorial Pathway Academy and Student Services Center, North Garland High School, and South Garland High School. BRW Architects, the design firm, has six other TDLR-registered projects totaling $39,882,150, including Rio Bank Jackson and Parks Maintenance Building. These projects span various locations and statuses, reflecting the firms’ ongoing involvement in construction and renovation work.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75042 (Garland)
One email per change. Unsubscribe in one click. Privacy.
GISD Handley ES Playground Replacement is a Renovation/Alteration project located at 3725 Broadway Blvd,, Garland, TX 75042 in Garland, Texas. The project has an estimated value of $453K covering 4,910 sq ft. Garland Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on December 4, 2024.
Frequently Asked Questions
What is the status of the GISD Handley Elementary School playground project?
The project is closed. TDLR passed the final inspection in February 2026 and closed the project file in June 2026, indicating the accessibility review process is complete.
What work was done on the Handley Elementary playground?
The project replaced playground equipment and surfaces, added a new shade canopy, and included civil improvements like drainage and sidewalk repairs across 4,910 sq ft.
Who owned and designed the Handley Elementary playground project?
Garland Independent School District was the owner, and BRW Architects was the design firm of record for the project.
How much did the Handley Elementary playground renovation cost?
The estimated cost was $452,879, with a cost per square foot of $92 for the 4,910 sq ft of work.
Is the Handley Elementary playground open?
The TDLR record confirms the construction is complete and the project file is closed, but it does not specify if the playground is open to the public.
What is GISD Handley ES Playground Replacement?
GISD Handley ES Playground Replacement is a renovation/alteration project at 3725 Broadway Blvd in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 4910 sq.ft.
Is GISD Handley ES Playground Replacement open in Garland?
Construction on GISD Handley ES Playground Replacement is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is GISD Handley ES Playground Replacement located?
GISD Handley ES Playground Replacement is located at 3725 Broadway Blvd, Garland, TX, 75042, in Dallas County.
Who is the owner or developer of GISD Handley ES Playground Replacement?
Garland Independent School District is the property owner/developer of record for GISD Handley ES Playground Replacement, per its TDLR project registration.
Who is the architect or design firm for GISD Handley ES Playground Replacement?
BRW Architects is the design firm of record for GISD Handley ES Playground Replacement, according to its TDLR filing.
How much does GISD Handley ES Playground Replacement cost and how big is it?
GISD Handley ES Playground Replacement has an estimated construction value of $453K and approximately 4,910 square feet (about $92/sqft), based on its TDLR filing.
Scope of Work
Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 4910 sq.ft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3725 Broadway Blvd, Garland, TX, 75042
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$715.7M totalWatch all construction in 75042 (Garland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Garland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.