Construction complete · Jun 2026Project Closed

GISD Stephens Playground Replacement at ES and Prek Schools is a renovation/alteration project at 3700 Cheyenne Dr, Rowlett, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $406K across about 5,850 sq ft.

Estimated project value
$406K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,850 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$69/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 4, 2024563 days across supplied datesJun 20, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    179 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    213 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About GISD Stephens Playground Replacement at ES and Prek Schools

Garland Independent School District completed a $405,543 renovation at GISD Stephens Elementary School in Rowlett, Texas. The project, registered with TDLR, focused on replacing playground equipment, resurfacing the play area, and installing a new shade canopy. The scope included civil improvements such as drainage updates and sidewalk repairs across 5,850 square feet of site work.

Project Scope and Design

BRW Architects served as the design firm of record for this renovation and alteration project. The work involved a comprehensive update to the outdoor play environment at the elementary school and pre-kindergarten levels. Marcela Abadi Rhoads was the registered accessibility specialist associated with the filing. The project utilized public funds for the construction activities on the school grounds.

The estimated cost of $405,543 places this project above the median estimated cost for renovation and alteration filings in Dallas County, which stands at $250,000. The project size of 5,850 square feet is larger than the county median of 4,218 square feet. The cost per square foot was approximately $69, which is close to the county median of $73 per square foot for similar projects.

Timeline and Status

Construction was scheduled to begin in June 2025, with a planned completion date of December 2025. The scheduled build window was 213 days, which is longer than the county median of 92 days for comparable renovation projects. The final inspection passed in February 2026, confirming that the work met the required standards.

TDLR closed the project file in June 2026, which marks the end of the accessibility review process for this construction. This status indicates that all regulatory requirements for the project have been satisfied. The project is part of a broader portfolio of work by Garland Independent School District, which has six other TDLR-registered projects totaling over $152 million.

The location is in Rowlett, a city in Dallas County with a population of approximately 27,128 according to U.S. Census estimates for the 75088 ZIP code. The median household income in this area is $105,064. This project adds to the district’s infrastructure investments in the region, following other significant developments like the Memorial Pathway Academy and Student Services Center in Garland.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75088 (Rowlett)

One email per change. Unsubscribe in one click. Privacy.

GISD Stephens Playground Replacement at ES and Prek Schools is a Renovation/Alteration project located at 3700 Cheyenne Dr,, Rowlett, TX 75088 in Rowlett, Texas. The project has an estimated value of $406K covering 5,850 sq ft. Garland Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on December 4, 2024.

Frequently Asked Questions

Is the playground at GISD Stephens Elementary School finished?

Yes. The final inspection passed in February 2026, and TDLR closed the project file in June 2026, indicating the construction work is complete.

Who designed the new playground at GISD Stephens?

BRW Architects was the design firm of record. Marcela Abadi Rhoads served as the registered accessibility specialist for the project filing.

How much did the playground replacement cost?

The estimated cost was $405,543. This is above the median cost for similar renovation projects in Dallas County, which is $250,000.

What was included in the scope of work?

The scope included replacing playground equipment and surface, adding a new shade canopy, and civil improvements like drainage and sidewalk repairs.

When did construction start and end?

Construction started in June 2025. The final inspection passed in February 2026, and the TDLR file was closed in June 2026.

What is GISD Stephens Playground Replacement at ES and Prek Schools?

GISD Stephens Playground Replacement at ES and Prek Schools is a renovation/alteration project at 3700 Cheyenne Dr in Rowlett, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5850 sq.ft.

Is GISD Stephens Playground Replacement at ES and Prek Schools open in Rowlett?

Construction on GISD Stephens Playground Replacement at ES and Prek Schools is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is GISD Stephens Playground Replacement at ES and Prek Schools located?

GISD Stephens Playground Replacement at ES and Prek Schools is located at 3700 Cheyenne Dr, Rowlett, TX, 75088, in Dallas County.

Who is the owner or developer of GISD Stephens Playground Replacement at ES and Prek Schools?

Garland Independent School District is the property owner/developer of record for GISD Stephens Playground Replacement at ES and Prek Schools, per its TDLR project registration.

Who is the architect or design firm for GISD Stephens Playground Replacement at ES and Prek Schools?

BRW Architects is the design firm of record for GISD Stephens Playground Replacement at ES and Prek Schools, according to its TDLR filing.

How much does GISD Stephens Playground Replacement at ES and Prek Schools cost and how big is it?

GISD Stephens Playground Replacement at ES and Prek Schools has an estimated construction value of $406K and approximately 5,850 square feet (about $69/sqft), based on its TDLR filing.

Scope of Work

Replace playground equipment, surface, and include a new shade canopy. Civil improvements like drainage and sidewalk repairs 5850 sq.ft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3700 Cheyenne Dr, Rowlett, TX, 75088

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75088 (Rowlett)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.