Project intelligenceTDLR TABS2025006932Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Frontier Ticket Counters/BSO/ATO Renovation in Houston, TX

IAH Airport, Terminal A., Houston, TX, 77032

Construction complete · Aug 2026Project Closed

Frontier Ticket Counters/BSO/ATO Renovation is a renovation/alteration project at IAH Airport, Terminal A., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $310K across about 1,100 sq ft.

Estimated project value
$310K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,100 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$282/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 8, 2024949 days across supplied datesAug 14, 2026

6 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    332 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    99 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    390 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    128 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Frontier Ticket Counters/BSO/ATO Renovation

The renovation of Terminal A at George Bush Intercontinental Airport in Houston is complete. This project, filed as the Frontier Ticket Counters/BSO/ATO Renovation, involved a tenant improvement build-out of an existing 1,100 sq ft space. The work focused on creating an office area, a ticketing counter with baggage check capabilities, and a checked baggage office. The total estimated cost for this renovation was $310,000.

The City of Houston is the owner of record for this project, which took place on public land. The design firm of record is Tessere, a company that has also worked on other TDLR-registered projects in Texas, including the Dallas Zoo Herpetarium Building. The registered accessibility specialist for this filing was Meghan Broussard Simecek. Because the project involves public funds and public land, it underwent a specific review process to ensure compliance with accessibility standards.

Construction Timeline and Cost Analysis

Construction began in January 2024, and the filing indicated a completion date of March 2025. The final inspection passed in April 2026. In August 2026, TDLR closed the project file, marking the end of the accessibility review process for this construction. The scheduled build window was 431 days, which is longer than the county median of 92 days for similar renovation projects in Harris County. The cost per square foot was $282, a figure that is above the county median of $80 per square foot for renovation and alteration filings.

While the project cost is above the county median for its type, it remains within the typical range for commercial renovations in the area. The City of Houston has six other TDLR-registered projects totaling over $46 million, ranging from police stations to transfer facilities. This specific terminal renovation is a smaller component of the broader airport infrastructure, designed to improve operational efficiency for ticketing and baggage handling.

The location is in ZIP code 77032, an area with a population of about 13,536 according to U.S. Census estimates. The median household income in this ZIP code is $36,731, and housing is mostly renter-occupied. The completion of this renovation adds to the modernized facilities available at Houston's primary international airport.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77032 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Frontier Ticket Counters/BSO/ATO Renovation is a Renovation/Alteration project located at IAH Airport, Terminal A., Houston, TX 77032 in Houston, Texas. The project has an estimated value of $310K covering 1,100 sq ft. CITY OF HOUSTON is the property owner and TESSERE is the design firm of record. The project was registered with TDLR on December 5, 2024.

Frequently Asked Questions

Is the Terminal A renovation complete?

Yes, the final inspection passed in April 2026, and TDLR closed the project file in August 2026. The construction status is complete, though this record does not confirm when public operations resumed.

Who owned and designed this project?

The City of Houston is the owner of record, and Tessere is the design firm of record. The registered accessibility specialist was Meghan Broussard Simecek.

What was the scope of the work?

The project involved a tenant improvement build-out of an existing 1,100 sq ft space. This included an office area, a ticketing counter with baggage check, and a checked baggage office.

How much did the renovation cost?

The estimated cost was $310,000. This equates to $282 per square foot, which is above the Harris County median of $80 per square foot for similar renovation filings.

Where exactly is this project located?

The project is located at IAH Airport, Terminal A., Houston, TX 77032. It is part of the George Bush Intercontinental Airport complex in Harris County.

What is Frontier Ticket Counters/BSO/ATO Renovation?

Frontier Ticket Counters/BSO/ATO Renovation is a renovation/alteration project at IAH Airport, Terminal A. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project is for a TI build out of an existing space. The areas being built-out are:an office area, Ticketing counter area/ baggage check. checked Baggage office.

Is Frontier Ticket Counters/BSO/ATO Renovation open in Houston?

Construction on Frontier Ticket Counters/BSO/ATO Renovation is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Frontier Ticket Counters/BSO/ATO Renovation located?

Frontier Ticket Counters/BSO/ATO Renovation is located at IAH Airport, Terminal A., Houston, TX, 77032, in Harris County.

Who is the owner or developer of Frontier Ticket Counters/BSO/ATO Renovation?

CITY OF HOUSTON is the property owner/developer of record for Frontier Ticket Counters/BSO/ATO Renovation, per its TDLR project registration.

Who is the architect or design firm for Frontier Ticket Counters/BSO/ATO Renovation?

TESSERE is the design firm of record for Frontier Ticket Counters/BSO/ATO Renovation, according to its TDLR filing.

How much does Frontier Ticket Counters/BSO/ATO Renovation cost and how big is it?

Frontier Ticket Counters/BSO/ATO Renovation has an estimated construction value of $310K and approximately 1,100 square feet (about $282/sqft), based on its TDLR filing.

Scope of Work

The project is for a TI build out of an existing space. The areas being built-out are:an office area, Ticketing counter area/ baggage check. checked Baggage office.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

IAH Airport, Terminal A., Houston, TX, 77032

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77032 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.