Project intelligenceTDLR TABS2025007468New Construction
Funding type

This project is privately funded, on private land for private use.

Medina Electric Cooperative District Office in Hondo, TX

237 TX-173 North, Hondo, TX, 78861

Construction complete · Oct 2026Project Closed

Medina Electric Cooperative District Office is a new construction project at 237 TX-173 North, Hondo, in Medina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $4.3M across about 43,560 sq ft.

Estimated project value
$4.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
43,560 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$99/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 12, 2024663 days across supplied datesOct 6, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    185 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    200 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    190 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Medina Electric Cooperative District Office

Medina Electric Cooperative completed a 43,560-square-foot warehouse and vehicle storage facility at 237 TX-173 North in Hondo, Texas. This new construction project, filed under the name Medina Electric Cooperative District Office, was privately funded on private land for the cooperative's exclusive use. The total estimated cost was $4,326,362, resulting in a construction cost of $99 per square foot. The project scope included district office renovations alongside the new storage and vehicle facilities.

Guernsey served as the design firm of record for this development. Eddie Hare was the registered accessibility specialist associated with the project. The registration with the Texas Department of Licensing and Regulation (TDLR) occurred in December 2024, with plan review completed in the same month. Construction began in June 2025, and the filing indicated a scheduled completion date of January 2026. The final inspection was passed in March 2026, and TDLR closed the project file in October 2026, marking the end of the accessibility review process for this construction.

Project Context and Comparisons

This project is one of several recent filings by Medina Electric Cooperative. The cooperative has three other TDLR-registered projects totaling $8,550,000, including a separate Warehouse and Vehicle Storage project in Hondo valued at $5,800,000 and a Corporate Office project valued at $250,000. All three of these other projects are also closed. Guernsey, the design firm, has six other TDLR-registered projects totaling $61,620,036 across various Texas locations, including projects for Pedernales Elect Coop and Southwest Texas Electric Cooperative.

When compared to 129 TDLR-registered new construction filings in Medina County, this project's cost is above the county median of $1,250,000. The median size for these filings is 8,339 square feet, while this project is significantly larger at 43,560 square feet. The median cost per square foot for the county is $200, making this project's $99 per square foot below that median. The scheduled build window for this project was 200 days, which is shorter than the county median of 288 days.

The area around Hondo, in ZIP code 78861, has a population of about 13,715 residents according to U.S. Census American Community Survey 2023 five-year estimates. The median household income in this area is $64,491, and the median owner-occupied home value is $210,100. Housing in this region is predominantly owner-occupied. Medina County's unemployment rate was 4.6 percent in August 2026, which is lower than the rate a year earlier.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78861 (Hondo)

One email per change. Unsubscribe in one click. Privacy.

Medina Electric Cooperative District Office is a New Construction project located at 237 TX-173 North, Hondo, TX 78861 in Hondo, Texas. The project has an estimated value of $4.3M covering 43,560 sq ft. Medina Electric Cooperative is the property owner and Guernsey is the design firm of record. The project was registered with TDLR on December 12, 2024.

Frequently Asked Questions

Is the Medina Electric Cooperative warehouse in Hondo finished?

Yes. The final inspection was passed in March 2026, and TDLR closed the project file in October 2026. This indicates the construction and accessibility review processes are complete.

How large is the new storage facility?

The facility is 43,560 square feet. This is significantly larger than the median size of 8,339 square feet for other new construction projects in Medina County.

Who designed the building?

Guernsey is the design firm of record. They have worked on several other electric cooperative projects in Texas, including facilities in Liberty Hill and Eldorado.

What was the total cost of the project?

The estimated cost was $4,326,362. This is above the county median cost of $1,250,000 for similar new construction filings in Medina County.

When did construction start and end?

Construction started in June 2025. The filing listed a completion date of January 2026, though the final inspection was passed in March 2026.

What is Medina Electric Cooperative District Office?

Medina Electric Cooperative District Office is a new construction project at 237 TX-173 North in Hondo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: District office Renovations

Is Medina Electric Cooperative District Office open in Hondo?

Construction on Medina Electric Cooperative District Office is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Medina Electric Cooperative District Office located?

Medina Electric Cooperative District Office is located at 237 TX-173 North, Hondo, TX, 78861, in Medina County.

Who is the owner or developer of Medina Electric Cooperative District Office?

Medina Electric Cooperative is the property owner/developer of record for Medina Electric Cooperative District Office, per its TDLR project registration.

Who is the architect or design firm for Medina Electric Cooperative District Office?

Guernsey is the design firm of record for Medina Electric Cooperative District Office, according to its TDLR filing.

How much does Medina Electric Cooperative District Office cost and how big is it?

Medina Electric Cooperative District Office has an estimated construction value of $4.3M and approximately 43,560 square feet (about $99/sqft), based on its TDLR filing.

Scope of Work

District office Renovations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

237 TX-173 North, Hondo, TX, 78861

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78861 (Hondo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.