Bespoke
Bespoke is a renovation/alteration project at 1300 E 5th St Suite 375, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $551K across about 7,866 sq ft.
๐Project Metrics
TDLR #TABS2025007565Project Closed
Project has been completed and closed
Bespoke is a Renovation/Alteration project located at 1300 E 5th St Suite 375, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $551K covering 7,866 sq ft. CIM Group is the property owner and Sixthriver Architects is the design firm of record. The project was registered with TDLR on December 12, 2024.
โFrequently Asked Questions
What is Bespoke?
Bespoke is a renovation/alteration project at 1300 E 5th St Suite 375 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of an existing shell office space.
Is Bespoke open in Austin?
Construction on Bespoke is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Bespoke located?
Bespoke is located at 1300 E 5th St Suite 375, Austin, TX, 78702, in Travis County.
Who is the owner or developer of Bespoke?
CIM Group is the property owner/developer of record for Bespoke, per its TDLR project registration.
Who is the architect or design firm for Bespoke?
Sixthriver Architects is the design firm of record for Bespoke, according to its TDLR filing.
How much does Bespoke cost and how big is it?
Bespoke has an estimated construction value of $551K and approximately 7,866 square feet (about $70/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of an existing shell office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 12, 2024
Review Complete
Inspection Complete
Closed
Dec 12, 2024
๐Related Projects
๐คSame Owner
$18.9M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Install Level 2 EV Charger
Replacing galvanized and copper water pipe front yard and underneath home.
Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three access holds: one in front one on the side and one behind the house.
Main elctrica panel upgrade.