Project intelligenceTDLR TABS2025007571Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

SBI Steel in Dallas, TX

4020 Maple Ave, Suite 600, Dallas, TX, 75219

Target date passed (Apr 2025)Project Registered

SBI Steel is a renovation/alteration project at 4020 Maple Ave, Suite 600, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $900K across about 5,042 sq ft.

Estimated project value
$900K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,042 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$179/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 12, 2024110 days across supplied datesApr 1, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    110 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SBI Steel

A 5,042 sq ft interior renovation at 4020 Maple Ave, Suite 600, in the Oak Lawn neighborhood of Dallas, was registered with TDLR in December 2024. The project, filed under the name SBI Steel, involves converting a shell-condition tenant suite for private use. With an estimated cost of $900,000, the work represents a significant investment in the building's interior infrastructure.

The filing identifies Crow Holdings as the owner of record and Entos Design as the design firm. The scope is strictly limited to the renovation of the interior tenant suite from shell condition, meaning the work focuses on finishing spaces that were previously unfinished. The target completion date listed on the filing is April 2025, a date that has now passed.

Project Context and Market Position

At $900,000, this project’s estimated cost is above the county median for renovation and alteration filings in Dallas County, which stands at $250,000. The cost per square foot is $179, which is above the county median of $73. The scheduled build window of 110 days is close to the county median of 92 days. These figures place the project in the top quarter of estimated costs for similar work in the area.

Crow Holdings has six other TDLR-registered projects totaling $3,809,700, including multiple other Old Parkland filings in Dallas. Entos Design has six other TDLR-registered projects totaling $2,411,721 across Dallas, Plano, Richardson, and Irving. The site is located near existing businesses including Zaguan Latin Café & Bakery and Dallas Scottish Rite for Children.

Despite the registered target completion of April 2025, no plan review or inspection has been recorded since registration. Therefore, whether the project proceeded to completion is not confirmed in the public record. The TDLR status remains Project Registered, reflecting the initial filing rather than verified completion.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75219 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

SBI Steel is a Renovation/Alteration project located at 4020 Maple Ave, Suite 600, Dallas, TX 75219 in Dallas, Texas. The project has an estimated value of $900K covering 5,042 sq ft. Crow Holdings is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on December 12, 2024.

Frequently Asked Questions

Is the Old Parkland renovation open for business?

The TDLR record does not confirm that the business is open. The filing shows a target completion date of April 2025, but no plan review or inspection has been recorded, so completion is not verified in the public record.

Who is the owner of the Old Parkland project?

Crow Holdings is listed as the owner of record on the TDLR filing for the 4020 Maple Ave renovation. Entos Design is the design firm of record for the project.

What is the estimated cost of this renovation?

The estimated cost for the 5,042 sq ft interior renovation is $900,000. This figure is above the Dallas County median for similar renovation and alteration filings, which is $250,000.

Where is the Old Parkland project located?

The project is located at 4020 Maple Ave, Suite 600, in the Oak Lawn neighborhood of Dallas, Texas. The ZIP code is 75219, and the county is Dallas County.

What type of work is being done?

The scope of work is the renovation of an interior tenant suite from shell condition. This involves finishing previously unfinished spaces for private use on private land.

What is SBI Steel?

SBI Steel is a renovation/alteration project at 4020 Maple Ave, Suite 600 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of interior tenant suite from shell condition.

Is SBI Steel open in Dallas?

SBI Steel was scheduled to finish construction in Apr 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is SBI Steel located?

SBI Steel is located at 4020 Maple Ave, Suite 600, Dallas, TX, 75219, in Dallas County.

Who is the owner or developer of SBI Steel?

Crow Holdings is the property owner/developer of record for SBI Steel, per its TDLR project registration.

Who is the architect or design firm for SBI Steel?

Entos Design is the design firm of record for SBI Steel, according to its TDLR filing.

How much does SBI Steel cost and how big is it?

SBI Steel has an estimated construction value of $900K and approximately 5,042 square feet (about $179/sqft), based on its TDLR filing.

Scope of Work

Renovation of interior tenant suite from shell condition.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4020 Maple Ave, Suite 600, Dallas, TX, 75219

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75219 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.