Project intelligenceTDLR TABS2025007623Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

McDonald's (42-1799) SAO-2 in Dallas, TX

8435 S Hampton, Dallas, TX, 75232

Construction complete · Jun 2026Inspection Complete

McDonald's (42-1799) SAO-2 is a renovation/alteration project at 8435 S Hampton, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $175K across about 1,564 sq ft.

Estimated project value
$175K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,564 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$112/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 13, 2024554 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    101 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    421 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About McDonald's (42-1799) SAO-2

McDonald's USA completed a renovation at 8435 S Hampton in Dallas. The project, filed as McDonald's (42-1799) SAO-2, involved tenant improvements for a new customer service area covering 1,564 sq ft. The building passed its final TDLR accessibility inspection in June 2026, confirming that construction is finished.

Project Scope and Cost

Victron Energy, Inc. served as the owner of record for this privately funded renovation on private land. The estimated cost was $175,000, which calculates to $112 per square foot. This cost per square foot is above the Dallas County median of $73 for similar renovation filings, even though the total project cost is below the county median of $250,000.

Castles Design Group was the design firm of record. Kathy Ann Riley was the registered accessibility specialist. The project was registered with TDLR in December 2024, with plan review completed in the same month. Construction began in March 2025, with a scheduled completion date of April 2025. The actual final inspection occurred in June 2026.

Local Context

The site is located in ZIP code 75232, where the U.S. Census estimates a population of about 32,967 and a median household income of $57,315. Nearby businesses include Southwest Kia, Cheddar's Scratch Kitchen, and Lowe's Home Improvement. Victron Energy, Inc. has one other TDLR-registered project in the record, a $750,000 renovation for Golden Chick in Grand Prairie that is closed.

Castles Design Group has six other TDLR-registered projects totaling $9,930,000, including work for El Paso Zoo, AutoNation CDJR Katy, and Cavender Subaru of Midland. The scheduled build window for this project was 32 days, which is shorter than the Dallas County median of 92 days for renovation and alteration filings.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75232 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

McDonald's (42-1799) SAO-2 is a Renovation/Alteration project located at 8435 S Hampton, Dallas, TX 75232 in Dallas, Texas. The project has an estimated value of $175K covering 1,564 sq ft. Victron Energy, Inc. is the property owner and Castles Design Group is the design firm of record. The project was registered with TDLR on December 13, 2024.

Frequently Asked Questions

Is the McDonald's in Dallas open?

The TDLR record confirms construction is complete and the final TDLR accessibility inspection passed in June 2026. The record does not specify business opening dates or current operating hours.

Who designed the McDonald's renovation in Dallas?

Castles Design Group was the design firm of record for the project at 8435 S Hampton. Kathy Ann Riley served as the registered accessibility specialist.

How much did the renovation cost?

The estimated cost was $175,000. This breaks down to $112 per square foot for the 1,564 sq ft project, which is above the county median per square foot.

When was the final inspection completed?

The final TDLR accessibility inspection was passed in June 2026. This date is later than the scheduled completion date of April 2025 listed in the filing.

What was the scope of work?

The filing describes the scope as tenant improvement only, specifically the creation of a new customer service area within the existing building.

What is McDonald's (42-1799) SAO-2?

McDonald's (42-1799) SAO-2 is a renovation/alteration project at 8435 S Hampton in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant improvement only - new customer service area

Is McDonald's (42-1799) SAO-2 open in Dallas?

Construction on McDonald's (42-1799) SAO-2 is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is McDonald's (42-1799) SAO-2 located?

McDonald's (42-1799) SAO-2 is located at 8435 S Hampton, Dallas, TX, 75232, in Dallas County.

Who is the owner or developer of McDonald's (42-1799) SAO-2?

Victron Energy, Inc. is the property owner/developer of record for McDonald's (42-1799) SAO-2, per its TDLR project registration.

Who is the architect or design firm for McDonald's (42-1799) SAO-2?

Castles Design Group is the design firm of record for McDonald's (42-1799) SAO-2, according to its TDLR filing.

How much does McDonald's (42-1799) SAO-2 cost and how big is it?

McDonald's (42-1799) SAO-2 has an estimated construction value of $175K and approximately 1,564 square feet (about $112/sqft), based on its TDLR filing.

Scope of Work

tenant improvement only - new customer service area

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8435 S Hampton, Dallas, TX, 75232

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75232 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.