Pilot Point 2024 Downtown Sidewalk Improvements Phase II

102 E Main Street, Pilot Point, TX, 76258

Construction complete · Dec 2024Project Closed

Pilot Point 2024 Downtown Sidewalk Improvements Phase II is a new construction project at 102 E Main Street, Pilot Point, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $145K across about 12,200 sq ft.

Estimated project value
$145K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 13, 2024185 days across supplied datesJun 16, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Project closed · TDLR filing

    The project record was closed in TDLR.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76258 (Pilot Point)

One email per change. Unsubscribe in one click. Privacy.

Pilot Point 2024 Downtown Sidewalk Improvements Phase II is a New Construction project located at 102 E Main Street, Pilot Point, TX 76258 in Pilot Point, Texas. The project has an estimated value of $145K covering 12,200 sq ft. City of Pilot Point, TX is the property owner. The project was registered with TDLR on December 13, 2024.

Frequently Asked Questions

What is Pilot Point 2024 Downtown Sidewalk Improvements Phase II?

Pilot Point 2024 Downtown Sidewalk Improvements Phase II is a new construction project at 102 E Main Street in Pilot Point, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Various Sidewalk installations near downtown square.

Is Pilot Point 2024 Downtown Sidewalk Improvements Phase II open in Pilot Point?

Construction on Pilot Point 2024 Downtown Sidewalk Improvements Phase II is complete — TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.

Where is Pilot Point 2024 Downtown Sidewalk Improvements Phase II located?

Pilot Point 2024 Downtown Sidewalk Improvements Phase II is located at 102 E Main Street, Pilot Point, TX, 76258, in Denton County.

Who is the owner or developer of Pilot Point 2024 Downtown Sidewalk Improvements Phase II?

City of Pilot Point, TX is the property owner/developer of record for Pilot Point 2024 Downtown Sidewalk Improvements Phase II, per its TDLR project registration.

How much does Pilot Point 2024 Downtown Sidewalk Improvements Phase II cost and how big is it?

Pilot Point 2024 Downtown Sidewalk Improvements Phase II has an estimated construction value of $145K and approximately 12,200 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Various Sidewalk installations near downtown square.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

102 E Main Street, Pilot Point, TX, 76258

Location by street address

Related Projects

Watch all construction in 76258 (Pilot Point)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pilot Point?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.