Funding type
This project is privately funded, on private land for private use.
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2
3100 East 5th Street, Austin, TX, 78702
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 is a renovation/alteration project at 3100 East 5th Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $8.5M across about 52,200 sq ft.
- Estimated project value
- $8.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 52,200 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $162/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
146 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
308 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78702 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 is a Renovation/Alteration project located at 3100 East 5th Street, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $8.5M covering 52,200 sq ft. Capital Metro is the property owner and MWM Design Group is the design firm of record. The project was registered with TDLR on December 17, 2024.
Frequently Asked Questions
What is Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2?
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 is a renovation/alteration project at 3100 East 5th Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior fit-out including architectural and MEP improvements. Fit-out for this phase is limited to Suite 100, Suite 200, and Suite 120 of the building. Limited TAS/TDLR and security improvements are also included on the 1st and 2nd floors.
Is Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 open in Austin?
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 was scheduled to finish construction in Mar 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 located?
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 is located at 3100 East 5th Street, Austin, TX, 78702, in Travis County.
Who is the owner or developer of Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2?
Capital Metro is the property owner/developer of record for Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2, per its TDLR project registration.
Who is the architect or design firm for Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2?
MWM Design Group is the design firm of record for Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2, according to its TDLR filing.
How much does Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 cost and how big is it?
Capital Metro Tenant Improvements & Facility Modifications for New Headquarters Phase 2 has an estimated construction value of $8.5M and approximately 52,200 square feet (about $162/sqft), based on its TDLR filing.
Scope of Work
Interior fit-out including architectural and MEP improvements. Fit-out for this phase is limited to Suite 100, Suite 200, and Suite 120 of the building. Limited TAS/TDLR and security improvements are also included on the 1st and 2nd floors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3100 East 5th Street, Austin, TX, 78702
Related Projects
Same Owner
$11.9M totalRelated City Permits
Building permits found at or near this location
BASE: Installing a backup battery system and additional meter socket.
cap offs w/ww
Total demo of sfr 1000 sq ft circa 1961 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Total demo of sfr 1000 sq ft circa 1961 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Replacement of an existing water heater 40G gas Water Heater Replacement
Watch all construction in 78702 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.