Spring ISD | Spring High School Replacement
630 Riley Fuzzel Road, Spring, TX, 77386
Spring ISD | Spring High School Replacement is a new construction project at 630 Riley Fuzzel Road, Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $300.0M across about 729,000 sq ft.
- Estimated project value
- $300.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 729,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $412/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
203 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
900 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Spring ISD | Spring High School Replacement
Spring ISD | Spring High School Replacement is a new construction project located at 630 Riley Fuzzel Road in Spring, Texas. This 729,000-square-foot facility is owned by Spring ISD and designed by Huckabee. The estimated cost for the project is $300,000,000, which computes to $412 per square foot. This scale places the project well above the median estimated cost for new construction filings in Harris County, which stood at $750,000 in the last 24 months.
William T Winning is the registered accessibility specialist for Spring ISD | Spring High School Replacement. The filing was registered with TDLR in December 2024, and plan review was completed in the same month. Construction is scheduled to begin in July 2025, with the project scheduled to finish in December 2027. This represents a construction window of approximately 900 days, which is longer than the county median build window of 219 days for similar new construction filings.
Project Context and Ownership
Spring ISD is the owner of record for this significant investment in educational infrastructure. The district has several other TDLR-registered projects, including the Spring Leadership Academy Renovation and the Hoyland Elementary SPARK Park. Huckabee, the design firm of record, has also worked on other Texas education projects, such as the Midway ISD Midway HS Athletics Addition and Renovation in Waco. This project is part of a broader trend of infrastructure development in the Spring area, which is located in Harris County.
The site is situated in ZIP code 77386, an area with a population of approximately 69,549 people. Census estimates for this ZIP code indicate a median household income of $130,094 and a median owner-occupied home value of $346,300. The housing stock in this area is predominantly owner-occupied.
Public funds are involved in this project, as it involves public land. This is consistent with the nature of a public school district undertaking a major replacement facility. The project status is listed as Review Complete by TDLR, confirming that the regulatory planning phase has been finalized ahead of the scheduled construction start in mid-2025. The substantial size and cost of the project reflect its role as a central educational hub for the Spring ISD community.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77386 (Spring)
One email per change. Unsubscribe in one click. Privacy.
Spring ISD | Spring High School Replacement is a New Construction project located at 630 Riley Fuzzel Road, Spring, TX 77386 in Spring, Texas. The project has an estimated value of $300.0M covering 729,000 sq ft. Spring ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on December 17, 2024.
Frequently Asked Questions
When is the new Spring High School expected to be completed?
Construction is scheduled to finish in December 2027. The project is set to start in July 2025, following the completion of plan review in December 2024.
How much does the Spring High School replacement cost?
The estimated cost is $300,000,000. For a 729,000-square-foot building, this equates to $412 per square foot, which is above the Harris County median for new construction.
Who is designing the new Spring High School?
Huckabee is the design firm of record for the project. Spring ISD is the owner and developer of record for this new construction effort.
Is the new high school open to students yet?
No, the building is under new construction. The project is scheduled to finish in December 2027, so it is not yet open for occupancy or operation.
What is the size of the new Spring High School?
The facility is 729,000 square feet. This is significantly larger than the median size of 8,962 square feet for new construction projects in Harris County.
What is Spring ISD | Spring High School Replacement?
Spring ISD | Spring High School Replacement is a new construction project at 630 Riley Fuzzel Road in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Spring ISD | Spring High School Replacement
Is Spring ISD | Spring High School Replacement open in Spring?
Spring ISD | Spring High School Replacement is still under construction in Spring, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is Spring ISD | Spring High School Replacement located?
Spring ISD | Spring High School Replacement is located at 630 Riley Fuzzel Road, Spring, TX, 77386, in Harris County.
Who is the owner or developer of Spring ISD | Spring High School Replacement?
Spring ISD is the property owner/developer of record for Spring ISD | Spring High School Replacement, per its TDLR project registration.
Who is the architect or design firm for Spring ISD | Spring High School Replacement?
Huckabee is the design firm of record for Spring ISD | Spring High School Replacement, according to its TDLR filing.
How much does Spring ISD | Spring High School Replacement cost and how big is it?
Spring ISD | Spring High School Replacement has an estimated construction value of $300.0M and approximately 729,000 square feet (about $412/sqft), based on its TDLR filing.
Scope of Work
Spring ISD | Spring High School Replacement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
630 Riley Fuzzel Road, Spring, TX, 77386
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$385.7M totalWatch all construction in 77386 (Spring)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spring?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.