Peraton
Peraton is a renovation/alteration project at 913 Billy Mitchell Blvd. Suite 109, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $3.8M across about 9,851 sq ft.
๐Project Metrics
TDLR #TABS2025008165Review Complete
Design review complete, construction may proceed
Peraton is a Renovation/Alteration project located at 913 Billy Mitchell Blvd. Suite 109, San Antonio, TX 78226 in San Antonio, Texas. The project has an estimated value of $3.8M covering 9,851 sq ft. Port Authority San Antonio is the property owner and Beaty Palmer Architects is the design firm of record. The project was registered with TDLR on December 19, 2024.
โFrequently Asked Questions
What is Peraton?
Peraton is a renovation/alteration project at 913 Billy Mitchell Blvd. Suite 109 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This is a second generation office finish out at an existing building.
Is Peraton open in San Antonio?
Peraton is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is Peraton located?
Peraton is located at 913 Billy Mitchell Blvd. Suite 109, San Antonio, TX, 78226, in Bexar County.
Who is the owner or developer of Peraton?
Port Authority San Antonio is the property owner/developer of record for Peraton, per its TDLR project registration.
Who is the architect or design firm for Peraton?
Beaty Palmer Architects is the design firm of record for Peraton, according to its TDLR filing.
How much does Peraton cost and how big is it?
Peraton has an estimated construction value of $3.8M and approximately 9,851 square feet (about $386/sqft), based on its TDLR filing.
๐Scope of Work
This is a second generation office finish out at an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 19, 2024
Review Complete
Dec 19, 2024
Inspection Complete
Closed