Project intelligenceTDLR TABS2025008291Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

NDSISD - Band Hall in Diana, TX

1373 US HIGHWAY 259 S, Diana, TX, 75640

Target date passed (Sep 2026)Project Registered

NDSISD - Band Hall is a additions to existing building project at 1373 US HIGHWAY 259 S, Diana, in Upshur County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.4M across about 9,500 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$253/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 20, 2024649 days across supplied datesSep 30, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    102 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    547 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About NDSISD - Band Hall

NDSISD - Band Hall is a $2,400,000 project filed by New Diana ISD in December 2024 for the facility at 1373 US Highway 259 S in Diana, Texas. The scope covers 5,500 square feet of interior renovations, a 4,000 square foot addition, and associated site work including parking, site walks, and landscaping. The total project size is 9,500 square feet.

Pfluger Architects is the design firm of record for this addition to an existing building. Ronald L Davis is the registered accessibility specialist. The filing notes that the project involves public funds, public land, or is a Federally funded roadway project. The scheduled construction start was April 2025, with a target completion date of September 2026.

Project Status and Cost Context

The TDLR status is Project Registered. no plan review or inspection has been recorded since the initial filing, so whether construction proceeded as scheduled is not confirmed in the public record. The estimated cost of $2,400,000 is above the county median for similar additions to existing buildings, which is $775,000. The cost per square foot is $253, close to the county median of $233.

New Diana ISD has four other TDLR-registered projects totaling $17,150,000, including a Multi-Purpose Gym in Diana valued at $14,000,000. Pfluger Architects has worked on six other registered projects totaling $155,068,129, including a sports complex in Brenham and an elementary school in Kenedy. The scheduled build window of 547 days is longer than the county median of 211 days for this type of work.

Third-party listings on ConstructConnect describe the project as demolition, site work, paving, renovation, and addition to a mixed-use development in Diana. The ZIP code 75640 has a population of about 5,720 and a median household income of $80,833 according to Census estimates. Upshur County unemployment was 4.9 percent in August 2026, lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75640 (Diana)

One email per change. Unsubscribe in one click. Privacy.

NDSISD - Band Hall is a Additions to Existing Building project located at 1373 US HIGHWAY 259 S in Diana, Texas. The project has an estimated value of $2.4M covering 9,500 sq ft. NEW DIANA ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on December 20, 2024.

Frequently Asked Questions

Is the Band Hall renovation finished?

The filing lists a completion date of September 2026, but no plan review or inspection has been recorded. The public record does not confirm if the work was completed.

Who is the architect for the Diana Band Hall project?

Pfluger Architects is the design firm of record. Ronald L Davis is the registered accessibility specialist listed in the TDLR filing.

How much does the Band Hall expansion cost?

The estimated cost is $2,400,000. This is above the Upshur County median for similar additions, which is $775,000.

What is the total square footage of the project?

The project totals 9,500 square feet. This includes 5,500 square feet of interior renovations and a 4,000 square foot addition.

Where is the Band Hall located?

The address is 1373 US Highway 259 S in Diana, Upshur County, Texas.

What is NDSISD - Band Hall?

NDSISD - Band Hall is a additions to existing building project at 1373 US HIGHWAY 259 S in Diana, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5,500 SF of Interior renovations to the Band Hall, a 4,000 SF addition, and associated site work including parking, site walks, and landscaping.

Is NDSISD - Band Hall open in Diana?

NDSISD - Band Hall was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is NDSISD - Band Hall located?

NDSISD - Band Hall is located at 1373 US HIGHWAY 259 S, Diana, TX, 75640, in Upshur County.

Who is the owner or developer of NDSISD - Band Hall?

NEW DIANA ISD is the property owner/developer of record for NDSISD - Band Hall, per its TDLR project registration.

Who is the architect or design firm for NDSISD - Band Hall?

Pfluger Architects is the design firm of record for NDSISD - Band Hall, according to its TDLR filing.

How much does NDSISD - Band Hall cost and how big is it?

NDSISD - Band Hall has an estimated construction value of $2.4M and approximately 9,500 square feet (about $253/sqft), based on its TDLR filing.

Scope of Work

5,500 SF of Interior renovations to the Band Hall, a 4,000 SF addition, and associated site work including parking, site walks, and landscaping.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1373 US HIGHWAY 259 S, Diana, TX, 75640

Loading location map…
32.70843, -94.75204

Watch all construction in 75640 (Diana)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.