Funding type
This project is privately funded, on private land for private use.
BSLMC FY25 MED EQ UPGRADES - HYBRID OR in Houston, TX
6720 Bertner Avenue, Houston, TX, 77030
BSLMC FY25 MED EQ UPGRADES - HYBRID OR is a renovation/alteration project at 6720 Bertner Avenue, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.5M across about 1,120 sq ft.
- Estimated project value
- $1.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,120 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.34K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
42 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
137 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
427 days after the preceding date shown.
Source: TDLR filing
View source record
📰About BSLMC FY25 MED EQ UPGRADES - HYBRID OR
The Bslmc Fy25 MED EQ Upgrades - Hybrid OR project at Baylor St. Luke's Medical Center in Houston completed a $1,500,000 renovation of its Hybrid Operating Room #11. The work passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete. The project involved replacing medical equipment in the 1,120 sq ft room, requiring new finishes and infrastructure modifications to accommodate the upgraded technology.
Located at 6720 Bertner Avenue in the Medical Center Area, the renovation was executed by CommonSpirit Health, the owner of record. The design firm of record was Devenney Group Ltd, Architects. The project was registered with TDLR in December 2024, with plan review completed in the same month. Construction began in February 2025, and the filing indicated a scheduled completion date of June 2025.
The estimated cost of $1,500,000 places this project above the Harris County median for renovation and alteration filings, which stands at $250,000. The cost per square foot is $1,339, significantly higher than the county median of $80 per square foot. The scheduled build window of 137 days was longer than the county median of 92 days for similar projects. This level of investment reflects the specialized nature of hybrid operating room upgrades, which require precise coordination of medical equipment and building systems.
Project Context and Local Activity
CommonSpirit Health has six other TDLR-registered projects totaling $6,307,600 in the region, including work at Baylor St. Luke's Medical Center and St. Luke's Health facilities in Houston and Bryan. Devenney Group Ltd, Architects has designed three other TDLR-registered projects totaling $26,100,000, including a $24,000,000 project at Medical City McKinney. The Medical Center Area is a hub for healthcare renovations, with other registered projects including Amegy on Main and Houston Methodist Neurosensory building.
The surrounding area includes several medical practices and hospitals, such as Harris Health Ben Taub Hospital and multiple private physician offices. Census estimates for ZIP code 77030 indicate a population of about 12,976 and a median household income of $79,415. The housing stock in this ZIP code is mostly renter-occupied, with a median owner-occupied home value of $614,100. This demographic profile underscores the high density of healthcare services and professional residents in the immediate vicinity of the project site.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77030 (Houston)
One email per change. Unsubscribe in one click. Privacy.
BSLMC FY25 MED EQ UPGRADES - HYBRID OR is a Renovation/Alteration project located at 6720 Bertner Avenue, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $1.5M covering 1,120 sq ft. CommonSpirit Health is the property owner and Devenney Group Ltd, Architects is the design firm of record. The project was registered with TDLR on December 23, 2024.
Frequently Asked Questions
Is the Hybrid OR #11 renovation complete?
Yes, the project passed its final TDLR accessibility inspection in August 2026, confirming that construction and all required modifications are finished.
What was the scope of the work?
The renovation included replacing medical equipment in Hybrid OR #11 and modifying the room's finishes and infrastructure to accommodate the new systems.
Who was the design firm?
Devenney Group Ltd, Architects was the design firm of record for this project at Baylor St. Luke's Medical Center.
How does the cost compare to other projects?
At $1,500,000, the project cost is above the Harris County median for renovation filings, which is $250,000.
When did construction start?
Construction began in February 2025, following the completion of plan review in December 2024.
What is BSLMC FY25 MED EQ UPGRADES - HYBRID OR?
BSLMC FY25 MED EQ UPGRADES - HYBRID OR is a renovation/alteration project at 6720 Bertner Avenue in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: MEDICAL EQUIPMENT REPLACEMENT TO THE HYBRID OR #11 (CVOR) ROOM. THE PROJECT INCLUDES MODIFICATIONS TO THE EXISTING ROOM TO ACCOMMODATE THE NEW EQUIPMENT, WHICH INCLUDES NEW FINISHES AND INFRASTRUCTURE MODIFICATIONS.
Is BSLMC FY25 MED EQ UPGRADES - HYBRID OR open in Houston?
Construction on BSLMC FY25 MED EQ UPGRADES - HYBRID OR is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is BSLMC FY25 MED EQ UPGRADES - HYBRID OR located?
BSLMC FY25 MED EQ UPGRADES - HYBRID OR is located at 6720 Bertner Avenue, Houston, TX, 77030, in Harris County.
Who is the owner or developer of BSLMC FY25 MED EQ UPGRADES - HYBRID OR?
CommonSpirit Health is the property owner/developer of record for BSLMC FY25 MED EQ UPGRADES - HYBRID OR, per its TDLR project registration.
Who is the architect or design firm for BSLMC FY25 MED EQ UPGRADES - HYBRID OR?
Devenney Group Ltd, Architects is the design firm of record for BSLMC FY25 MED EQ UPGRADES - HYBRID OR, according to its TDLR filing.
How much does BSLMC FY25 MED EQ UPGRADES - HYBRID OR cost and how big is it?
BSLMC FY25 MED EQ UPGRADES - HYBRID OR has an estimated construction value of $1.5M and approximately 1,120 square feet (about $1.34K/sqft), based on its TDLR filing.
Scope of Work
MEDICAL EQUIPMENT REPLACEMENT TO THE HYBRID OR #11 (CVOR) ROOM. THE PROJECT INCLUDES MODIFICATIONS TO THE EXISTING ROOM TO ACCOMMODATE THE NEW EQUIPMENT, WHICH INCLUDES NEW FINISHES AND INFRASTRUCTURE MODIFICATIONS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6720 Bertner Avenue, Houston, TX, 77030
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$5.1M totalRelated City Permits
Building permits found at or near this location
2,124 SF. LAB EQUIPMENT REMODEL 1-27-1-I2-A 2021 IBC SPK/FA
Watch all construction in 77030 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.