Gilleland Park Playground
๐Project Metrics
TDLR #TABS2025008409Review Complete
Design review complete, construction may proceed
๐Scope of Work
Alteration of existing playground area, addition of a paviilion structure and artificial turf at pool area, approximately 8,000 SF of concrete sidewalk and 3,000 SF of concrete pool deck
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$20.5M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 ton vertical heatpump system
Requesting to disconnect and reconnect. Updating old electrical panel to new 200 amp installing proper grounding replacing meter base and adding surge protection
The scope of work planned includes: installation and relocation of existing beverage equipment gondolas and food warming equipment. MOdifications to the existing plumbing and electrical systems as needed for the new and relocated equipment.
ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (10000 SF)
Express: Foundation Repair