Project intelligenceTDLR TABS2025008475Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Amarillo Municipal Court

201 SE 4th Ave., Amarillo, TX, 79101

Construction complete · Aug 2026Project Closed

City of Amarillo Municipal Court is a renovation/alteration project at 201 SE 4th Ave., Amarillo, in Potter County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $850K across about 21,110 sq ft.

Estimated project value
$850K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
21,110 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$40/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 26, 2024587 days across supplied datesAug 5, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    89 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    296 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    152 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About City of Amarillo Municipal Court

The renovation and alteration project at 201 SE 4th Ave. in Amarillo, Texas, is complete. The City of Amarillo Municipal Court filed this project with the Texas Department of Licensing and Regulation, identifying it as a renovation of the existing facility. The scope of work focused on infrastructure improvements rather than interior construction, specifically repaving the parking lot and a portion of the alley, replacing the sidewalk, and installing storm sewer to improve drainage. The total estimated cost for these exterior updates was $850,000.

OJD Engineering, LLC served as the design firm of record for the project. The registered accessibility specialist, Leslie Kit Carter, oversaw the compliance review process. The project was registered with TDLR in December 2024, with plan review completing in the same month. Construction began in February 2025. Although the filing indicated a completion date of May 2025, the final inspection was not passed until March 2026. This timeline reflects the actual duration of the construction and inspection phases.

Project Scale and Cost

The filing lists the project size at 21,110 sq ft, resulting in a computed cost of $40 per square foot. This figure is below the median of $86 per square foot for renovation and alteration projects in Potter County. The estimated total cost of $850,000 is above the county median of $300,000 for this type of work, placing it in the top quarter of similar filings. The scheduled build window of 89 days was shorter than the county median of 137 days, indicating a focused, rapid execution of the paving and sewer work.

The City of Amarillo is the owner of record and has registered six other projects with TDLR, totaling $8,548,000. Other recent projects by the city include the First Responders Memorial and improvements to John Stiff Park. OJD Engineering, LLC has also worked on four other registered projects, including the Downtown Sidewalk in Clarendon. This project involves public funds and public land, ensuring that the accessibility standards are met for the municipal facility.

TDLR closed the project file in August 2026, which marks the end of the accessibility review process for this construction. The final inspection passed in March 2026, confirming that the work met the required standards before the file was officially closed. This status confirms that the renovation is finished and the record is no longer active.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79101 (Amarillo)

One email per change. Unsubscribe in one click. Privacy.

City of Amarillo Municipal Court is a Renovation/Alteration project located at 201 SE 4th Ave., Amarillo, TX 79101 in Amarillo, Texas. The project has an estimated value of $850K covering 21,110 sq ft. City of Amarillo is the property owner and OJD Engineering, LLC is the design firm of record. The project was registered with TDLR on December 26, 2024.

Frequently Asked Questions

What work was done at the Amarillo Municipal Court?

The project involved repaving the parking lot and a portion of the alley, replacing the sidewalk, and installing storm sewer to improve drainage. The estimated cost was $850,000.

When was the final inspection passed?

The final inspection passed in March 2026. TDLR closed the project file in August 2026, marking the end of the accessibility review process.

Who is the owner of the project?

The City of Amarillo is the owner of record. OJD Engineering, LLC was the design firm, and Leslie Kit Carter was the registered accessibility specialist.

Is the Amarillo Municipal Court open?

The TDLR record confirms the construction and accessibility review are complete, with the file closed in August 2026. It does not specify the current business hours or operational status of the court.

How does the cost compare to other projects in Potter County?

The $850,000 cost is above the county median of $300,000 for renovation projects. The cost per square foot of $40 is below the county median of $86.

What is City of Amarillo Municipal Court?

City of Amarillo Municipal Court is a renovation/alteration project at 201 SE 4th Ave. in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Repaving an existing parking lot, repaving a portion of the alley, replacing sidewalk, installing storm sewer to improve parking lot drainage.

Is City of Amarillo Municipal Court open in Amarillo?

Construction on City of Amarillo Municipal Court is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is City of Amarillo Municipal Court located?

City of Amarillo Municipal Court is located at 201 SE 4th Ave., Amarillo, TX, 79101, in Potter County.

Who is the owner or developer of City of Amarillo Municipal Court?

City of Amarillo is the property owner/developer of record for City of Amarillo Municipal Court, per its TDLR project registration.

Who is the architect or design firm for City of Amarillo Municipal Court?

OJD Engineering, LLC is the design firm of record for City of Amarillo Municipal Court, according to its TDLR filing.

How much does City of Amarillo Municipal Court cost and how big is it?

City of Amarillo Municipal Court has an estimated construction value of $850K and approximately 21,110 square feet (about $40/sqft), based on its TDLR filing.

Scope of Work

Repaving an existing parking lot, repaving a portion of the alley, replacing sidewalk, installing storm sewer to improve parking lot drainage.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

201 SE 4th Ave., Amarillo, TX, 79101

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79101 (Amarillo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Amarillo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.