City Hall Entrance Accessibility Improvements in El Paso, TX

300 N. Campbell Street, El Paso, TX, 79901

Construction complete · Aug 2026Inspection Complete

City Hall Entrance Accessibility Improvements is a renovation/alteration project at 300 N. Campbell Street, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $125K across about 3,000 sq ft.

Estimated project value
$125K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$42/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 30, 2024583 days across supplied datesAug 5, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    350 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    198 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About City Hall Entrance Accessibility Improvements

The project known as City Hall-City of El Paso has completed accessibility improvements at 300 N. Campbell Street in Downtown El Paso. Filed with the Texas Department of Licensing and Regulation (TDLR) as City Hall Entrance Accessibility Improvements, the work focused on the reconstruction of the ADA ramp and pedestrian access. The renovation covered approximately 3,000 square feet, with an estimated cost of $125,000.

The City of El Paso, the owner of record, scheduled construction to begin in December 2025, with a planned completion date of July 2026. AECOM Technical Services, Inc. served as the design firm of record. Julie Ericson Gereda was the registered accessibility specialist for the filing. The project utilized public funds and took place on public land.

Project Status and Inspection

The project passed its final TDLR accessibility inspection in August 2026. This status confirms that the construction phase is complete and the accessibility features have met the required standards. The TDLR record indicates the inspection was passed, finalizing the regulatory process for this specific alteration. The building is now fully inspected for the accessibility modifications described in the filing.

Regional Context and Cost

At $125,000, the estimated cost for City Hall-City of El Paso is below the median estimated cost of $204,300 for renovation and alteration filings in El Paso County over the past two years. The cost per square foot, calculated at $42, is also below the county median of $66 per square foot for similar work. The scheduled build window of 198 days was longer than the county median of 120 days, reflecting the specific needs of the ramp reconstruction and pedestrian access enhancements.

City Hall is situated in Downtown El Paso, a neighborhood with a population of approximately 8,321 residents according to U.S. Census ACS 2023 five-year estimates for ZIP code 79901. The area is characterized by a median household income of $13,984 and a housing stock that is predominantly renter-occupied. Nearby landmarks and businesses include the El Paso County Clerk’s Office, the El Paso County District Clerk, and the Holiday Inn Express El Paso - Downtown. The City of El Paso has several other TDLR-registered projects in the county, including major infrastructure works like Fire Station No. 28 and the Sunland Park Shared Use Path, indicating a continued commitment to public facility development and accessibility.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79901 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

City Hall Entrance Accessibility Improvements is a Renovation/Alteration project located at 300 N. Campbell Street, El Paso, TX 79901 in El Paso, Texas. The project has an estimated value of $125K covering 3,000 sq ft. City of El Paso is the property owner and AECOM Technical Services, Inc. is the design firm of record. The project was registered with TDLR on December 30, 2024.

Frequently Asked Questions

Is the City Hall entrance accessibility project finished?

Yes, the project passed its final TDLR accessibility inspection in August 2026. The construction is complete, and the ADA ramp and pedestrian access improvements have been inspected and approved by the Texas Department of Licensing and Regulation.

What specific work was done on the City Hall entrance?

The scope of work included the reconstruction of the ADA ramp and pedestrian access. This renovation/alteration project covered approximately 3,000 square feet and was designed to improve accessibility compliance for the building's main entrance.

How much did the City Hall accessibility improvements cost?

The estimated cost for the project was $125,000. This figure is below the median estimated cost of $204,300 for similar renovation and alteration filings in El Paso County over the last 24 months.

Who was the design firm for this project?

AECOM Technical Services, Inc. was the design firm of record. They are responsible for the design aspects of the accessibility improvements, working alongside the registered accessibility specialist Julie Ericson Gereda.

When was the construction scheduled to take place?

Construction was scheduled to start in December 2025, with a planned completion date of July 2026. The final TDLR accessibility inspection was passed in August 2026, confirming the project's completion.

What is City Hall Entrance Accessibility Improvements?

City Hall Entrance Accessibility Improvements is a renovation/alteration project at 300 N. Campbell Street in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: reconstructi0n of ada ramp and pedestrian access

Is City Hall Entrance Accessibility Improvements open in El Paso?

Construction on City Hall Entrance Accessibility Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is City Hall Entrance Accessibility Improvements located?

City Hall Entrance Accessibility Improvements is located at 300 N. Campbell Street, El Paso, TX, 79901, in El Paso County.

Who is the owner or developer of City Hall Entrance Accessibility Improvements?

City of El Paso is the property owner/developer of record for City Hall Entrance Accessibility Improvements, per its TDLR project registration.

Who is the architect or design firm for City Hall Entrance Accessibility Improvements?

AECOM Technical Services, Inc. is the design firm of record for City Hall Entrance Accessibility Improvements, according to its TDLR filing.

How much does City Hall Entrance Accessibility Improvements cost and how big is it?

City Hall Entrance Accessibility Improvements has an estimated construction value of $125K and approximately 3,000 square feet (about $42/sqft), based on its TDLR filing.

Scope of Work

reconstructi0n of ada ramp and pedestrian access

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

300 N. Campbell Street, El Paso, TX, 79901

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79901 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.