Funding type
This project is privately funded, on private land for private use.
Pierce Skrabanek Expansion in Houston, TX
24 Greenway suite 500, Houston, TX, 77027
Pierce Skrabanek Expansion is a renovation/alteration project at 24 Greenway suite 500, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $170K across about 2,028 sq ft.
- Estimated project value
- $170K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,028 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $84/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
31 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
74 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
294 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
104 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Pierce Skrabanek Expansion
Project Overview and Scope
The Weslayan Tower renovation in Houston involved a second-generation buildout to expand an existing tenant suite on a multi-tenant floor of a high-rise building. Located at 24 Greenway, Suite 500, the project covered 2,028 square feet with an estimated cost of $170,000. This work was classified as a renovation and alteration, focusing on updating interior spaces within the existing structure rather than adding new exterior construction.
Granite Weslayan Properties, Ltd. served as the owner of record for this development. The design was handled by Tramonte Design Studio, a firm with a portfolio of other commercial projects in the region. William T. Winning was the registered accessibility specialist associated with the filing. The project was privately funded and conducted on private land for private use, distinguishing it from public infrastructure projects.
Timeline and Regulatory Status
The project registered with the Texas Department of Licensing and Regulation in January 2025. Plan review was completed in the same month, allowing construction to begin in February 2025. The filing indicated a scheduled completion date of April 2025. However, the final inspection was passed in February 2026, indicating a longer actual construction window than initially estimated. TDLR closed the project file in May 2026, which marks the end of the accessibility review process for this construction.
This project's estimated cost is below the Harris County median of $250,000 for similar renovation filings. The cost per square foot was $84, which is close to the county median of $80. The scheduled build window of 74 days was also close to the county median of 92 days. These figures place the Weslayan Tower expansion within the typical range for commercial renovations in the area, despite the final inspection occurring later than the original filing date suggested.
City of Houston permit records show six permits on file at this street address, issued between March 2026 and July 2026. These permits include work for interior demolition, office remodels, and bathroom renovations. The presence of these permits aligns with the scope of the renovation described in the TDLR filing, confirming active construction activity at the address during the period following the initial registration.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77027 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Pierce Skrabanek Expansion is a Renovation/Alteration project located at 24 Greenway suite 500, Houston, TX 77027 in Houston, Texas. The project has an estimated value of $170K covering 2,028 sq ft. Granite Weslayan Properties, Ltd. is the property owner and Tramonte Design Studio is the design firm of record. The project was registered with TDLR on January 3, 2025.
Frequently Asked Questions
Is the Weslayan Tower renovation complete?
Yes, the final inspection was passed in February 2026. TDLR closed the project file in May 2026, confirming the completion of the accessibility review process for this specific construction project.
Who designed the Weslayan Tower expansion?
Tramonte Design Studio was the design firm of record for this project. They are responsible for the architectural and design aspects of the 2,028-square-foot tenant suite expansion.
What was the estimated cost of the project?
The estimated cost for the Weslayan Tower renovation was $170,000. This amount is below the Harris County median of $250,000 for similar renovation and alteration filings.
When did construction start and finish?
Construction began in February 2025. The final inspection was passed in February 2026, indicating the physical work was completed well after the initial scheduled completion date of April 2025.
Is this project still active?
No, the project is no longer active. TDLR closed the project file in May 2026, marking the end of the regulatory process for this specific renovation.
What is Pierce Skrabanek Expansion?
Pierce Skrabanek Expansion is a renovation/alteration project at 24 Greenway suite 500 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Second generation buildout to expand existing tenant suite on existing multi-tenant floor in existing high-rise building.
Is Pierce Skrabanek Expansion open in Houston?
Construction on Pierce Skrabanek Expansion is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is Pierce Skrabanek Expansion located?
Pierce Skrabanek Expansion is located at 24 Greenway suite 500, Houston, TX, 77027, in Harris County.
Who is the owner or developer of Pierce Skrabanek Expansion?
Granite Weslayan Properties, Ltd. is the property owner/developer of record for Pierce Skrabanek Expansion, per its TDLR project registration.
Who is the architect or design firm for Pierce Skrabanek Expansion?
Tramonte Design Studio is the design firm of record for Pierce Skrabanek Expansion, according to its TDLR filing.
How much does Pierce Skrabanek Expansion cost and how big is it?
Pierce Skrabanek Expansion has an estimated construction value of $170K and approximately 2,028 square feet (about $84/sqft), based on its TDLR filing.
Scope of Work
Second generation buildout to expand existing tenant suite on existing multi-tenant floor in existing high-rise building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
24 Greenway suite 500, Houston, TX, 77027
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Related City Permits
Building permits found at or near this location
DEMO OF INTERIOR NON-LOAD BEARING NON-FIRE RATED WALLS 2021 IBC
5,500 SF. OFFICE REMODEL 1-20-1-B-A 2021 IBC
HI-RISE 19TH FL BATHROOM REMODEL 1-20-1-B-A-SPK-FA 21 IBC
DEMO OF INTERIOR NON-LOAD BEARING NON-FIRE RATED WALLS 2021 IBC
1,074 SQ FT OFFICE REMODEL 1-20-1-B-A- SPK-FA 2021 IBC
Watch all construction in 77027 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.