Shogun
Shogun is a renovation/alteration project at 111 SW Loop 410, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $90K across about 3,062 sq ft.
๐Project Metrics
TDLR #TABS2025009307Project Registered
Project has been registered with TDLR and is in pre-construction phase
Shogun is a Renovation/Alteration project located at 111 SW Loop 410, San Antonio, TX 78245 in San Antonio, Texas. The project has an estimated value of $90K covering 3,062 sq ft. Shogun 29 Enterprise is the property owner and seven-d-four is the design firm of record. The project was registered with TDLR on January 13, 2025.
โFrequently Asked Questions
What is Shogun?
Shogun is a renovation/alteration project at 111 SW Loop 410 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition to an existing 1-story restaurant building for additional seating capacity.
Is Shogun open in San Antonio?
Shogun is currently under construction in San Antonio, TX. Its current TDLR status is "Project Registered".
Where is Shogun located?
Shogun is located at 111 SW Loop 410, San Antonio, TX, 78245, in Bexar County.
Who is the owner or developer of Shogun?
Shogun 29 Enterprise is the property owner/developer of record for Shogun, per its TDLR project registration.
Who is the architect or design firm for Shogun?
seven-d-four is the design firm of record for Shogun, according to its TDLR filing.
How much does Shogun cost and how big is it?
Shogun has an estimated construction value of $90K and approximately 3,062 square feet (about $29/sqft), based on its TDLR filing.
๐Scope of Work
Addition to an existing 1-story restaurant building for additional seating capacity.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 13, 2025
Review Complete
Inspection Complete
Closed