Project intelligenceTDLR TABS2025009336Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Phase I - Physician Lounge & UMC Board Room in El Paso, TX

4815 Alameda Ave, El Paso, TX, 79905

Construction complete · Aug 2026Project Closed

Phase I - Physician Lounge & UMC Board Room is a renovation/alteration project at 4815 Alameda Ave, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $200K across about 1,325 sq ft.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,325 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$151/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 13, 2025584 days across supplied datesAug 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    374 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Phase I - Physician Lounge & UMC Board Room

The UMC Tower renovation at 4815 Alameda Ave in El Paso is a completed tenant improvement project registered with TDLR. The filing, titled Phase I - Physician Lounge & UMC Board Room, covers a 1,325 sq ft alteration with an estimated cost of $200,000. The owner of record is El Paso County Hospital Dist, and the design firm of record is EXIGO Architects.

This renovation took place in the Mission Valley neighborhood of El Paso County. The scope was defined as a tenant improvement renovation. The project involved public funds, public land, or is a Federally funded roadway project. The estimated cost of $200,000 is close to the county median for its type, which is $204,000. The scheduled build window of 182 days is longer than the county median of 120 days for similar renovation and alteration filings.

The cost per square foot for this project is $151, which is above the county median of $66. EXIGO Architects has six other TDLR-registered projects totaling $25,250,000, including The Vault, Fire Station No. 15, and Staybridge Suites in El Paso. Other registered projects in the same area include the Corbin-Sambrano Wellness Center and UMC El Paso, Thomason Tower.

The project was registered with TDLR in January 2025. Construction started in February 2025, and the final inspection passed in January 2025. The completion date on the filing was August 2025. TDLR closed the project file in August 2026, which marks the end of the accessibility review process for this construction.

Project Details

The UMC Tower project is located in ZIP code 79905. Census estimates for this area show a population of about 22,062 and a median household income of $25,496. The median owner-occupied home value is $103,900. Businesses near this site include the Paul L. Foster School of Medicine and San Juan Zinnia T MD. The El Paso County unemployment rate in August 2026 was 4.6 percent.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79905 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

Phase I - Physician Lounge & UMC Board Room is a Renovation/Alteration project located at 4815 Alameda Ave, El Paso, TX 79905 in El Paso, Texas. The project has an estimated value of $200K covering 1,325 sq ft. EL PASO COUNTY HOSPITAL DIST is the property owner and EXIGO Architects is the design firm of record. The project was registered with TDLR on January 13, 2025.

Frequently Asked Questions

Is the UMC Tower renovation complete?

The final inspection passed in January 2025. TDLR closed the project file in August 2026, marking the end of the accessibility review process.

What is the address of this project?

The project is located at 4815 Alameda Ave, El Paso, TX 79905, in the Mission Valley neighborhood.

Who is the owner of record?

El Paso County Hospital Dist is the owner or developer of record for this tenant improvement renovation.

What is the estimated cost of the renovation?

The estimated cost is $200,000 for 1,325 sq ft of work, which is close to the county median for similar projects.

Which design firm handled this project?

EXIGO Architects is the design firm of record for the UMC Tower tenant improvement renovation.

What is Phase I - Physician Lounge & UMC Board Room?

Phase I - Physician Lounge & UMC Board Room is a renovation/alteration project at 4815 Alameda Ave in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant improvement renovation

Is Phase I - Physician Lounge & UMC Board Room open in El Paso?

Construction on Phase I - Physician Lounge & UMC Board Room is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Phase I - Physician Lounge & UMC Board Room located?

Phase I - Physician Lounge & UMC Board Room is located at 4815 Alameda Ave, El Paso, TX, 79905, in El Paso County.

Who is the owner or developer of Phase I - Physician Lounge & UMC Board Room?

EL PASO COUNTY HOSPITAL DIST is the property owner/developer of record for Phase I - Physician Lounge & UMC Board Room, per its TDLR project registration.

Who is the architect or design firm for Phase I - Physician Lounge & UMC Board Room?

EXIGO Architects is the design firm of record for Phase I - Physician Lounge & UMC Board Room, according to its TDLR filing.

How much does Phase I - Physician Lounge & UMC Board Room cost and how big is it?

Phase I - Physician Lounge & UMC Board Room has an estimated construction value of $200K and approximately 1,325 square feet (about $151/sqft), based on its TDLR filing.

Scope of Work

Tenant improvement renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4815 Alameda Ave, El Paso, TX, 79905

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79905 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.