Kava Culture Bar
Kava Culture Bar is a renovation/alteration project at 7511 Main St, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $175K across about 1,027 sq ft.
๐Project Metrics
TDLR #TABS2025009564Review Complete
Design review complete, construction may proceed
Kava Culture Bar is a Renovation/Alteration project located at 7511 Main St, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $175K covering 1,027 sq ft. NACK PATIOS LLC is the property owner and KMT Architects is the design firm of record. The project was registered with TDLR on January 14, 2025.
โFrequently Asked Questions
What is Kava Culture Bar?
Kava Culture Bar is a renovation/alteration project at 7511 Main St in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First generation build out into a tea bar concept consisting of opening exterior walls and installing additional windows and doors. Also includes addition of electrical, mechanical and plumbing.
Is Kava Culture Bar open in Frisco?
Kava Culture Bar is currently under construction in Frisco, TX. Its current TDLR status is "Review Complete".
Where is Kava Culture Bar located?
Kava Culture Bar is located at 7511 Main St, Frisco, TX, 75034, in Collin County.
Who is the owner or developer of Kava Culture Bar?
NACK PATIOS LLC is the property owner/developer of record for Kava Culture Bar, per its TDLR project registration.
Who is the architect or design firm for Kava Culture Bar?
KMT Architects is the design firm of record for Kava Culture Bar, according to its TDLR filing.
How much does Kava Culture Bar cost and how big is it?
Kava Culture Bar has an estimated construction value of $175K and approximately 1,027 square feet (about $170/sqft), based on its TDLR filing.
๐Scope of Work
First generation build out into a tea bar concept consisting of opening exterior walls and installing additional windows and doors. Also includes addition of electrical, mechanical and plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 14, 2025
Review Complete
Jan 14, 2025
Inspection Complete
Closed