Project intelligenceTDLR TABS2025009814Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Military Parkway Trail in Mesquite, TX

Mesquite, Mesquite, TX, 75149

Target date passed (Nov 2025)Review Complete

Military Parkway Trail is a renovation/alteration project at Mesquite, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.7M across about 1,200 sq ft.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.43K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 17, 2025288 days across supplied datesNov 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Military Parkway Trail

The Military Parkway Trail is a $1,712,000 renovation and alteration project located in Mesquite, Texas, within Dallas County. The scope of work involves significant pedestrian infrastructure improvements, including a new sidewalk from Rodeo Dr. to Military Parkway and a new 12-foot concrete trail extending east from I-635 for approximately 1,200 feet. The design continues east as a 10-foot concrete trail until Carmack St., with additional sidewalk improvements from Locust to Ebrite St.

Dallas County is the owner of record, and Dallas County Public Works serves as the design firm. The project is registered with TDLR under the accessibility program, with Mary Rae Davies listed as the registered accessibility specialist. The filing indicates that the project involves public funds, public land, or is a Federally funded roadway project. The estimated cost of $1,712,000 places this project in the top quarter of estimated costs for renovation and alteration filings in Dallas County, where the median estimated cost is $250,000.

Construction Timeline and Status

TDLR completed plan review in January 2025, and the construction start date per the filing is March 2025. The scheduled completion date on the filing is November 2025. Although this date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The scheduled build window of 245 days is longer than the county median of 92 days for similar projects. The project’s estimated cost per square foot is $1,427, which is above the county median of $73 per square foot for renovation and alteration work.

The project is situated in ZIP code 75149, where the U.S. Census Bureau’s 2023 five-year estimates report a population of about 58,849 and a median household income of $70,629. The area has 21,058 housing units, with a median owner-occupied home value of $207,500. Dallas County Public Works has one other TDLR-registered project, the Harry Hines Blvd. project in Dallas, which is closed. Dallas County has six other TDLR-registered projects totaling $139,292,920, including the Old Red Courthouse and the Grand Prairie Government Center.

Other registered projects in the same area include the Building 2 Beltline Campus, Csj: 0918-47-509, AutoZone # 10970, Broadmoor Plaza Shopping Center, and City Building 823. The Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier. The Military Parkway Trail project aims to enhance pedestrian connectivity and accessibility in the Mesquite area, with a focus on concrete trails and sidewalk improvements. The project’s status remains under review, with no final inspection recorded by TDLR.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75149 (Mesquite)

One email per change. Unsubscribe in one click. Privacy.

Military Parkway Trail is a Renovation/Alteration project located at Mesquite, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $1.7M covering 1,200 sq ft. Dallas County is the property owner and Dallas County Public Works is the design firm of record. The project was registered with TDLR on January 17, 2025.

Frequently Asked Questions

What is the estimated cost of the Military Parkway Trail project?

The estimated cost of the Military Parkway Trail project is $1,712,000. This places it in the top quarter of estimated costs for renovation and alteration filings in Dallas County.

Who is the owner of the Military Parkway Trail project?

The owner of the Military Parkway Trail project is Dallas County. The design firm of record is Dallas County Public Works.

What is the scope of work for the Military Parkway Trail project?

The scope of work includes a new sidewalk from Rodeo Dr. to Military Parkway, a new 12-foot concrete trail east from I-635 for approximately 1,200 feet, a 10-foot concrete trail until Carmack St., and sidewalk improvements from Locust to Ebrite St.

Is the Military Parkway Trail project complete?

TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The scheduled completion date on the filing is November 2025.

What is Military Parkway Trail?

Military Parkway Trail is a renovation/alteration project at Mesquite in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New sidewalk from Rodeo Dr. to Military Parkway, new 12' concrete trail east from 635 for approx. 1200 ft., continuing east from there as a 10' concrete trail until Carmack St., and sidewalk improvement from Locust to Ebrite St.

Is Military Parkway Trail open in Mesquite?

Military Parkway Trail was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Military Parkway Trail located?

Military Parkway Trail is located at Mesquite, Mesquite, TX, 75149, in Dallas County.

Who is the owner or developer of Military Parkway Trail?

Dallas County is the property owner/developer of record for Military Parkway Trail, per its TDLR project registration.

Who is the architect or design firm for Military Parkway Trail?

Dallas County Public Works is the design firm of record for Military Parkway Trail, according to its TDLR filing.

How much does Military Parkway Trail cost and how big is it?

Military Parkway Trail has an estimated construction value of $1.7M and approximately 1,200 square feet (about $1.43K/sqft), based on its TDLR filing.

Scope of Work

New sidewalk from Rodeo Dr. to Military Parkway, new 12' concrete trail east from 635 for approx. 1200 ft., continuing east from there as a 10' concrete trail until Carmack St., and sidewalk improvement from Locust to Ebrite St.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Mesquite, Mesquite, TX, 75149

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75149 (Mesquite)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mesquite?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.