Funding type
This project is privately funded, on private land for private use.
Fuel Station Remodel in Edinburg, TX
1212 S Closner, Edinburg, TX, 78539
Fuel Station Remodel is a renovation/alteration project at 1212 S Closner, Edinburg, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $507K across about 7,255 sq ft.
- Estimated project value
- $507K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 7,255 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $70/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
33 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
53 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Fuel Station Remodel
HEB #172 at 1212 S Closner in Edinburg is a completed fuel station remodel that passed its final TDLR accessibility inspection in January 2025. The project involved significant infrastructure upgrades, including the removal of one 20,000-gallon existing tank and the installation of one 31,000-gallon underground storage tank. The filing identifies the work as a Renovation/Alteration with an estimated cost of $506,936.
The scope of work extended beyond the tanks to include the removal of the existing kiosk and its reinstallation as a new unit. The project also required the removal of the existing canopy and the installation of a new canopy. These changes affect a total square footage of 7,255 sq ft, resulting in a computed cost of $70 per sq ft.
Project Scope and Timeline
Registered with the Texas Department of Licensing and Regulation (TDLR) in January 2025, the construction start date listed in the filing is February 2025. The scheduled completion date was April 2025. The project is privately funded on private land for private use. The registered accessibility specialist for this filing is Anthony Covacevich.
In Hidalgo County, the median estimated cost for renovation and alteration filings is $250,000. This project’s cost of $506,936 is above that county median. The median size for similar filings is 3,924 sq ft, while this project covers 7,255 sq ft. The median scheduled build window in the county is 92 days, whereas this project’s scheduled window was 53 days, which is shorter than the median.
HEB has six other TDLR-registered projects totaling $154,850,000. Other registered projects in the Edinburg area include Divine Mercy Church, Another Closet Storage, and the Edinburg Community Engagement and Student Success Building. The project is located in ZIP code 78539, which has a population of about 38,162 according to U.S. Census ACS 2023 five-year estimates.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78539 (Edinburg)
One email per change. Unsubscribe in one click. Privacy.
Fuel Station Remodel is a Renovation/Alteration project located at 1212 S Closner, Edinburg, TX 78539 in Edinburg, Texas. The project has an estimated value of $507K covering 7,255 sq ft. HEB is the property owner. The project was registered with TDLR on January 22, 2025.
Frequently Asked Questions
Is HEB #172 in Edinburg open for business?
The TDLR record indicates the construction is complete and the final TDLR accessibility inspection was passed in January 2025. The record does not specify the exact date the business began serving customers.
What was the estimated cost of the HEB #172 remodel?
The estimated cost for the fuel station remodel at 1212 S Closner is $506,936. This figure is above the median estimated cost of $250,000 for similar renovation filings in Hidalgo County.
What specific work was done on the fuel tanks?
The project involved the removal of one existing 20,000-gallon tank and the installation of one new 31,000-gallon underground storage tank. This work was part of a broader renovation including canopy and kiosk updates.
Who is the registered accessibility specialist for this project?
Anthony Covacevich is the registered accessibility specialist listed in the TDLR filing for the HEB #172 fuel station remodel in Edinburg, Texas.
How does the project size compare to local renovations?
The project covers 7,255 sq ft. This is larger than the median size of 3,924 sq ft for renovation and alteration filings in Hidalgo County.
What is Fuel Station Remodel?
Fuel Station Remodel is a renovation/alteration project at 1212 S Closner in Edinburg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of (1) 20k existing type of tank, and Installation of (1) 31k UST. Removal of existing kiosk, reinstallation of new kiosk. Removal of existing canopy, installation of new canopy.
Is Fuel Station Remodel open in Edinburg?
Construction on Fuel Station Remodel is complete — TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Where is Fuel Station Remodel located?
Fuel Station Remodel is located at 1212 S Closner, Edinburg, TX, 78539, in Hidalgo County.
Who is the owner or developer of Fuel Station Remodel?
HEB is the property owner/developer of record for Fuel Station Remodel, per its TDLR project registration.
How much does Fuel Station Remodel cost and how big is it?
Fuel Station Remodel has an estimated construction value of $507K and approximately 7,255 square feet (about $70/sqft), based on its TDLR filing.
Scope of Work
Removal of (1) 20k existing type of tank, and Installation of (1) 31k UST. Removal of existing kiosk, reinstallation of new kiosk. Removal of existing canopy, installation of new canopy.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1212 S Closner, Edinburg, TX, 78539
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 78539 (Edinburg)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Edinburg?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.