Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Thrall ISD Package E
503 S Bounds St, Thrall, TX, 76587
Thrall ISD Package E is a renovation/alteration project at 503 S Bounds St, Thrall, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.0M across about 5,350 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,350 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $187/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
110 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
116 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Thrall ISD Package E
Thrall Middle School at 503 S Bounds St in Thrall, Texas, is the site of a $1,000,000 renovation project registered with TDLR in January 2025. The filing, identified as Thrall ISD Package E, details work to renovate four classrooms and two administration areas within a total scope of 5,350 square feet. This specific alteration project is managed by the Thrall Independent School District, with Elaine K Andersen serving as the registered accessibility specialist.
The estimated cost of $1,000,000 translates to $187 per square foot. In the context of Williamson County, this figure is above the county median of $95 per square foot for renovation and alteration filings. The total project cost also sits in the top quarter of the county’s median estimated costs, which range from $140,000 to $520,846 for similar work. This scale distinguishes the project from the median renovation size of 3,000 square feet recorded in the area.
Construction Timeline and Status
Plan review for this project was completed in January 2025. Construction was scheduled to begin in May 2025, with a planned completion date of September 2025. The scheduled build window of 116 days is longer than the county median of 92 days for comparable renovation and alteration projects. Despite the scheduled completion date having passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
The project involves public funds and public land. The Thrall Independent School District has other TDLR-registered projects in the area, including a new elementary school, a high school addition, and an event center totaling $51,667,693. Other nearby registered work includes new concession and restroom facilities, as well as existing elementary and administration renovations. The district’s portfolio indicates a broader pattern of infrastructure investment in the Thrall community.
The status of the site remains unverified in the public record because the final inspection step is pending. The TDLR record confirms the scope, cost, and scheduled timeline, but it does not confirm physical completion or occupancy. The project is classified as a renovation and alteration, distinct from new construction or additions to existing buildings found in other local filings.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76587 (Thrall)
One email per change. Unsubscribe in one click. Privacy.
Thrall ISD Package E is a Renovation/Alteration project located at 503 S Bounds St, Thrall, TX 76587 in Thrall, Texas. The project has an estimated value of $1.0M covering 5,350 sq ft. Thrall Independent School District is the property owner. The project was registered with TDLR on January 29, 2025.
Frequently Asked Questions
What is the scope of the Thrall Middle School renovation?
The project involves renovating four classrooms and two administration areas. The total square footage for this work is 5,350 square feet, with an estimated cost of $1,000,000.
Who is the owner of record for this project?
The owner of record is the Thrall Independent School District. Elaine K Andersen is the registered accessibility specialist for this filing.
Has the project been completed?
Construction was scheduled to finish in September 2025. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
How does the cost compare to other projects in Williamson County?
The $187 per square foot cost is above the county median of $95. The total cost is in the top quarter of estimated costs for renovation and alteration filings in the county.
When did TDLR complete plan review?
Plan review was completed in January 2025. Construction was scheduled to start in May 2025 and finish in September 2025.
What is Thrall ISD Package E?
Thrall ISD Package E is a renovation/alteration project at 503 S Bounds St in Thrall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovating 4 classrooms and 2 administration areas.
Is Thrall ISD Package E open in Thrall?
Thrall ISD Package E was scheduled to finish construction in Sep 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Thrall ISD Package E located?
Thrall ISD Package E is located at 503 S Bounds St, Thrall, TX, 76587, in Williamson County.
Who is the owner or developer of Thrall ISD Package E?
Thrall Independent School District is the property owner/developer of record for Thrall ISD Package E, per its TDLR project registration.
How much does Thrall ISD Package E cost and how big is it?
Thrall ISD Package E has an estimated construction value of $1.0M and approximately 5,350 square feet (about $187/sqft), based on its TDLR filing.
Scope of Work
Renovating 4 classrooms and 2 administration areas.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
503 S Bounds St, Thrall, TX, 76587
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$57.6M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Meredith Brown
Retroactively permit attached covered patio
Express: Replace 5 windows size for size. No structural change
New pool with required enclosure
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 76587 (Thrall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Thrall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.