Project intelligenceTDLR TABS2025010676New Construction
Funding type

This project is privately funded, on private land for private use.

Office Warehouse Finish Out in Mckinney, TX

3275 N. McDonald Street Suite 1 &2, Mckinney, TX, 75071

Target date passed (Jul 2025)Review Complete

Office Warehouse Finish Out is a new construction project at 3275 N. McDonald Street Suite 1 &2, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $190K across about 6,850 sq ft.

Estimated project value
$190K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,850 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$28/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 30, 2025166 days across supplied datesJul 15, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    155 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Office Warehouse Finish Out

Zionco, LLC is developing a 6,850 square foot office and warehouse finish out at 3275 N. McDonald Street, Suite 1 & 2, in McKinney, Texas. The project, filed as a new construction effort, involves the interior completion of the space to serve both administrative and storage functions. The estimated cost for this specific scope of work is $190,000, which calculates to $28 per square foot. This figure is notably below the median cost per square foot for similar new construction filings in Collin County, which stands at $121.

The construction timeline was scheduled to begin in February 2025, following the completion of plan review in January 2025. The filing indicated a completion date of July 2025. However, the Texas Department of Licensing and Regulation has not yet recorded a final inspection. Consequently, the public record does not confirm the current physical state of the site or the completion of all required accessibility standards.

Project Details and Context

Zionco, LLC serves as the owner of record for this development. The design firm of record is Legacy ADPR, which has been involved in six other TDLR-registered projects in the region, totaling $5,185,000 in estimated costs. These other projects include medical office buildings and warehouse spaces in Fort Worth, Colleyville, and Southlake. The registered accessibility specialist for this project is Sheri Bumgardner. The work is privately funded on private land for private use.

In the broader context of the McKinney area, several other new construction projects are registered under the name McKinney Business Park. The ZIP code 75071, where this project is located, has a population of approximately 69,396 people according to U.S. Census American Community Survey 2023 five-year estimates. The median household income in this area is $132,839, and the median owner-occupied home value is $448,500. The housing stock in this ZIP code is predominantly owner-occupied, with about 23,861 housing units.

The scheduled build window for this project was 155 days, which is shorter than the county median of 212 days for new construction filings. While the cost is in the bottom quarter of similar filings in Collin County, the size of 6,850 square feet is close to the county median of 7,072 square feet. The project status remains under review complete, but without a final inspection, the operational status of the business is not confirmed in the public record.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75071 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Office Warehouse Finish Out is a New Construction project located at 3275 N. McDonald Street Suite 1 &2, Mckinney, TX 75071 in Mckinney, Texas. The project has an estimated value of $190K covering 6,850 sq ft. Zionco, LLC. is the property owner and Legacy ADPR is the design firm of record. The project was registered with TDLR on January 30, 2025.

Frequently Asked Questions

Is Zionco LLC open for business in McKinney?

The TDLR record shows the project has not yet recorded a final inspection. Therefore, the public record does not confirm that the business is open or operating. Construction status and business opening are distinct, and no opening date is listed in the filing.

What is the address of the Zionco LLC project?

The project is located at 3275 N. McDonald Street, Suite 1 & 2, in McKinney, TX 75071. This address is in Collin County and is part of the McKinney Business Park area.

Who is the design firm for this project?

Legacy ADPR is the design firm of record. They are also the design firm for six other TDLR-registered projects in the region, including medical office buildings and warehouse spaces in Fort Worth and Colleyville.

What is the estimated cost per square foot?

The estimated cost is $28 per square foot. This is calculated from the total estimated cost of $190,000 and the 6,850 square feet of new construction. This figure is below the Collin County median of $121 per square foot.

When was the project scheduled to be completed?

The filing listed a completion date of July 2025. Construction was scheduled to start in February 2025. However, TDLR has not yet recorded a final inspection, so the actual completion status is not confirmed in the public record.

What is Office Warehouse Finish Out?

Office Warehouse Finish Out is a new construction project at 3275 N. McDonald Street Suite 1 &2 in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 6850 SF Office Warehouse Finish Out

Is Office Warehouse Finish Out open in Mckinney?

Office Warehouse Finish Out was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Office Warehouse Finish Out located?

Office Warehouse Finish Out is located at 3275 N. McDonald Street Suite 1 &2, Mckinney, TX, 75071, in Collin County.

Who is the owner or developer of Office Warehouse Finish Out?

Zionco, LLC. is the property owner/developer of record for Office Warehouse Finish Out, per its TDLR project registration.

Who is the architect or design firm for Office Warehouse Finish Out?

Legacy ADPR is the design firm of record for Office Warehouse Finish Out, according to its TDLR filing.

How much does Office Warehouse Finish Out cost and how big is it?

Office Warehouse Finish Out has an estimated construction value of $190K and approximately 6,850 square feet (about $28/sqft), based on its TDLR filing.

Scope of Work

6850 SF Office Warehouse Finish Out

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3275 N. McDonald Street Suite 1 &2, Mckinney, TX, 75071

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75071 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.