SH 27 (CSJ: 0142-06-029) in Comfort, TX
From: US 87 To: Kendall/Kerr County Line, Comfort, TX, 78013
SH 27 (CSJ: 0142-06-029) is a renovation/alteration project at From: US 87 To: Kendall/Kerr County Line, Comfort, in Kendall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $80K across about 2,651 sq ft.
- Estimated project value
- $80K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,651 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $30/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
336 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SH 27 (CSJ: 0142-06-029)
TxDOT District: San Antonio completed a pavement renovation on State Highway 27 in Comfort, spanning from US 87 to the Kendall/Kerr County line. The project, registered as Csj: 0142-06-029, involved specific roadway maintenance tasks including base repair, milling, inlay, and new pavement markings. The scope covered 2,651 sq ft of surface area with an estimated cost of $80,200.
The work was scheduled to begin in March 2024, with a planned completion date of February 2025. The Texas Department of Licensing and Regulation (TDLR) closed the project file in January 2025, which marks the end of the accessibility review process for this construction. This timeline indicates the physical work concluded before the final administrative review was finalized.
Project Context and Cost Analysis
The estimated cost of $80,200 places this project below the median for renovation and alteration filings in Kendall County. Among 212 similar TDLR-registered projects in the area, the median estimated cost is $245,000. This specific project falls within the bottom quarter of those filings by cost. The calculated cost per square foot is $30, which is also below the county median of $95 per square foot for comparable work types.
Kimley-Horn served as the design firm of record for this roadway improvement. The registered accessibility specialist was Frank Fonseca. The project utilized public funds and is located on public land, consistent with Federally funded roadway standards.
TxDOT District: San Antonio holds six other TDLR-registered projects totaling $31,802,622, including significant infrastructure work in San Antonio and New Braunfels. Kimley-Horn has six other registered projects totaling $166,910,286, ranging from amenity centers in Terrell to roadway projects in Plano. This SH 27 segment represents a focused, smaller-scale maintenance effort within the agency’s broader portfolio of Texas infrastructure projects.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78013 (Comfort)
One email per change. Unsubscribe in one click. Privacy.
SH 27 (CSJ: 0142-06-029) is a Renovation/Alteration project located at From: US 87 To: Kendall/Kerr County Line in Comfort, Texas. The project has an estimated value of $80K covering 2,651 sq ft. TxDOT District: San Antonio is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on January 31, 2025.
Frequently Asked Questions
What work was done on SH 27?
The project involved base repair, milling, inlay, and pavement markings. The scope covered 2,651 sq ft of the roadway surface between US 87 and the Kendall/Kerr County line.
Who is the owner of this project?
The owner of record is TxDOT District: San Antonio. Kimley-Horn was the design firm, and Frank Fonseca was the registered accessibility specialist.
Is the project finished?
Yes. The TDLR closed the project file in January 2025. The scheduled completion date was February 2025, and the review process is complete.
How much did the project cost?
The estimated cost was $80,200. This is below the median cost for similar renovation projects in Kendall County, which is $245,000.
Where is the project located?
The project is located on State Highway 27 in Comfort, Kendall County. It runs from US 87 to the Kendall/Kerr County line.
What is SH 27 (CSJ: 0142-06-029)?
SH 27 (CSJ: 0142-06-029) is a renovation/alteration project at From: US 87 To: Kendall/Kerr County Line in Comfort, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Base repair, mill, inlay and pavement markings.
Is SH 27 (CSJ: 0142-06-029) open in Comfort?
Construction on SH 27 (CSJ: 0142-06-029) is complete — TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Where is SH 27 (CSJ: 0142-06-029) located?
SH 27 (CSJ: 0142-06-029) is located at From: US 87 To: Kendall/Kerr County Line, Comfort, TX, 78013, in Kendall County.
Who is the owner or developer of SH 27 (CSJ: 0142-06-029)?
TxDOT District: San Antonio is the property owner/developer of record for SH 27 (CSJ: 0142-06-029), per its TDLR project registration.
Who is the architect or design firm for SH 27 (CSJ: 0142-06-029)?
Kimley-Horn is the design firm of record for SH 27 (CSJ: 0142-06-029), according to its TDLR filing.
How much does SH 27 (CSJ: 0142-06-029) cost and how big is it?
SH 27 (CSJ: 0142-06-029) has an estimated construction value of $80K and approximately 2,651 square feet (about $30/sqft), based on its TDLR filing.
Scope of Work
Base repair, mill, inlay and pavement markings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: US 87 To: Kendall/Kerr County Line, Comfort, TX, 78013
Related Projects
Same Owner
$31.88B totalWatch all construction in 78013 (Comfort)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Comfort?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.