Burlington
Burlington is a renovation/alteration project at 11910 E US 290, Suite 332, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2025). The project has an estimated value of $1.3M across about 20,000 sq ft.
๐Project Metrics
TDLR #TABS2025010894Inspection Complete
Final inspection completed, awaiting project closure
Burlington is a Renovation/Alteration project located at 11910 E US 290, Suite 332, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $1.3M covering 20,000 sq ft. MC Retail LP is the property owner and icon architects, inc is the design firm of record. The project was registered with TDLR on February 2, 2025.
โFrequently Asked Questions
What is Burlington?
Burlington is a renovation/alteration project at 11910 E US 290, Suite 332 in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior finish out of an existing shell space
Is Burlington open in Manor?
Construction on Burlington is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2025. The building is finished and very likely open.
Where is Burlington located?
Burlington is located at 11910 E US 290, Suite 332, Manor, TX, 78653, in Travis County.
Who is the owner or developer of Burlington?
MC Retail LP is the property owner/developer of record for Burlington, per its TDLR project registration.
Who is the architect or design firm for Burlington?
icon architects, inc is the design firm of record for Burlington, according to its TDLR filing.
How much does Burlington cost and how big is it?
Burlington has an estimated construction value of $1.3M and approximately 20,000 square feet (about $65/sqft), based on its TDLR filing.
๐Scope of Work
interior finish out of an existing shell space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 2, 2025
Review Complete
Inspection Complete
Feb 2, 2025
Closed
๐Related Projects
๐คSame Owner
$24.5M total๐๏ธSame Design Firm
$7.80B total๐Related City Permits
Building permits found at or near this location
Install an EV charger.
Installing a new irrigation system
1360BL NEW 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
homebuilder loop refer to 2026 - 031745 BP
1360BL NEW 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO