Project has been completed and closed
BPIII LEVEL 3 COMMON CORRIDOR / DEMISE is a Alteration/Renovation project located at 10801 N. MOPAC EXPY BLDG. 3 in Austin, Texas. The project has an estimated value of $100K covering 3,288 sq ft. BRAKER P III, LLC C/O JESSICA STONE is the property owner and RED DESIGN STUDIOS is the design firm of record. The project was registered with TDLR on February 3, 2025.
This project consists of the demolition and finish out of a newly demised multi tenant corridor and new demising tenant walls. Suite occupancy classification and use group remains unchanged by the scope of this work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 3, 2025
Review Complete
Inspection Complete
Closed
Feb 3, 2025
Building permits found at or near this location
7 DAY - No architectural work in scope. Mech and Elec related work only of an existing demised tenant suite. Suite occupancy classificationand use group remains unchanged by the MEP Scope refer to MEP Drawings for detailed description of M/E scope. Minormechanical and ductwork relocationst. Electrical circuits to accommodate new tenant equipment loadsand locations. - OVA
7 DAY - No architectural work in scope. Mech and Elec related work only of an existing demised tenant suite. Suite occupancy classificationand use group remains unchanged by the MEP Scope refer to MEP Drawings for detailed description of M/E scope. Minormechanical and ductwork relocationst. Electrical circuits to accommodate new tenant equipment loadsand locations. - OVA
7 DAY - No architectural work in scope. Mech and Elec related work only of an existing demised tenant suite. Suite occupancy classificationand use group remains unchanged by the MEP Scope refer to MEP Drawings for detailed description of M/E scope. Minormechanical and ductwork relocationst. Electrical circuits to accommodate new tenant equipment loadsand locations. - OVA
Interior remodel to existing office to include Access Control see A1.60 and A2.02 for Access Control
Interior remodel to existing office to include Access Control see A1.60 and A2.02 for Access Control
Active businesses near this construction site
Business data from Google