Project intelligenceTDLR TABS2025011099Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

SK - Smoothie King # 2295 - Irving TX - TI

3143 West Airport Freeway Suite 104, Irving, TX, 75062

Construction complete · May 2026Inspection Complete

SK - Smoothie King # 2295 - Irving TX - TI is a renovation/alteration project at 3143 West Airport Freeway Suite 104, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $350K across about 1,405 sq ft.

Estimated project value
$350K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,405 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$249/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 5, 2025450 days across supplied datesMay 1, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    333 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SK - Smoothie King # 2295 - Irving TX - TI

The tenant finish-out for Smoothie King #2295 at Imperial Corner is complete. The project passed its final TDLR accessibility inspection in May 2026, confirming that construction is finished. The work took place at 3143 West Airport Freeway Suite 104 in Irving, Texas.

Bayview Tower GP, the owner of record, commissioned a 1,405 sq ft renovation on the ground floor of a new shell building. The estimated cost for this alteration was $350,000, which calculates to $249 per square foot. Partners 26, LLC served as the design firm of record for the project.

Project Scope and Costs

The filing describes the work as a tenant finish-out within a larger development. In Dallas County, the median estimated cost for similar renovation and alteration filings is $250,000. This project’s cost is above that county median. The median size for comparable filings is 4,222 sq ft, while this specific space is 1,405 sq ft. The median cost per square foot in the county is $73, placing this project’s $249 per square foot above the median.

Construction began in March 2025, following plan review completion in February 2025. The scheduled build window was 91 days, which is close to the county median of 92 days for similar projects. The project was registered with TDLR in February 2025 and privately funded for private use.

Owner and Design History

Bayview Tower GP has two other TDLR-registered projects in the area, including another Imperial Corner location in Irving. Partners 26, LLC has six other registered projects, including Smoothie King locations in Arlington and Stephenville. The registered accessibility specialist for this filing was Connie Fleming.

The surrounding ZIP code 75062 has a population of about 52,756 according to U.S. Census estimates. The median household income is $70,792, and the median owner-occupied home value is $254,500. Housing in this area is mostly renter-occupied. The Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75062 (Irving)

One email per change. Unsubscribe in one click. Privacy.

SK - Smoothie King # 2295 - Irving TX - TI is a Renovation/Alteration project located at 3143 West Airport Freeway Suite 104, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $350K covering 1,405 sq ft. Bayview Tower GP is the property owner and Partners 26, LLC is the design firm of record. The project was registered with TDLR on February 5, 2025.

Frequently Asked Questions

Is Smoothie King #2295 open?

The construction record shows the project passed its final TDLR accessibility inspection in May 2026. This confirms construction is complete. The record does not provide information about business opening dates or current operating status.

Where is the project located?

The address is 3143 West Airport Freeway Suite 104, Irving, TX 75062. It is located in Dallas County, Texas.

Who owned the project?

Bayview Tower GP is the owner/developer of record. Partners 26, LLC was the design firm of record.

How much did the renovation cost?

The estimated cost was $350,000. This is above the Dallas County median for similar renovation filings, which is $250,000.

When was construction completed?

The final TDLR accessibility inspection was passed in May 2026. Construction started in March 2025.

What is SK - Smoothie King # 2295 - Irving TX - TI?

SK - Smoothie King # 2295 - Irving TX - TI is a renovation/alteration project at 3143 West Airport Freeway Suite 104 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,405 sqft Tenant finish-out on the ground floor of a new shell building

Is SK - Smoothie King # 2295 - Irving TX - TI open in Irving?

Construction on SK - Smoothie King # 2295 - Irving TX - TI is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is SK - Smoothie King # 2295 - Irving TX - TI located?

SK - Smoothie King # 2295 - Irving TX - TI is located at 3143 West Airport Freeway Suite 104, Irving, TX, 75062, in Dallas County.

Who is the owner or developer of SK - Smoothie King # 2295 - Irving TX - TI?

Bayview Tower GP is the property owner/developer of record for SK - Smoothie King # 2295 - Irving TX - TI, per its TDLR project registration.

Who is the architect or design firm for SK - Smoothie King # 2295 - Irving TX - TI?

Partners 26, LLC is the design firm of record for SK - Smoothie King # 2295 - Irving TX - TI, according to its TDLR filing.

How much does SK - Smoothie King # 2295 - Irving TX - TI cost and how big is it?

SK - Smoothie King # 2295 - Irving TX - TI has an estimated construction value of $350K and approximately 1,405 square feet (about $249/sqft), based on its TDLR filing.

Scope of Work

1,405 sqft Tenant finish-out on the ground floor of a new shell building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3143 West Airport Freeway Suite 104, Irving, TX, 75062

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75062 (Irving)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.