Project intelligenceTDLR TABS2025011923New Construction
Funding type

This project is privately funded, on private land for private use.

New Convenience store

2601 State Hwy 155, Palestine, TX, 75803

Target date passed (Jan 2026)Review Complete

New Convenience store is a new construction project at 2601 State Hwy 155, Palestine, in Anderson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.0M across about 5,210 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,210 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$384/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 13, 2025326 days across supplied datesJan 5, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    81 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About New Convenience store

A new convenience store and gas station is under construction at 2601 State Hwy 155 in Palestine, Anderson County. The project is a ground-up build with an estimated cost of $2,000,000 and a total area of 5,210 sq ft. This filing was registered with TDLR in February 2025, establishing the public record for this specific development.

Moonlight Management, LCC is the owner of record, while G2 Design Studio serves as the design firm. The scope includes auto and truck fueling capabilities alongside the retail space. The estimated cost per square foot is $384, a figure that is above the county median of $152 for similar new construction filings in Anderson County. The scheduled build window of 245 days is close to the county median of 213 days.

Project Status and Timeline

TDLR completed plan review in February 2025, and construction was scheduled to finish in January 2026. However, the public record has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The TDLR status is listed as Review Complete, but this refers to the initial plan approval rather than the final completion of the physical structure.

The surrounding area includes existing businesses such as an Exxon gas station, Hampton Village, and several churches. The ZIP code 75803 has a population of about 21,390 and a median household income of $59,947, according to U.S. Census estimates.

G2 Design Studio has one other TDLR-registered project in the state, a fried chicken restaurant in Burleson. This Palestine project is privately funded and built on private land for private use. The registration details provide a transparent view of the construction parameters, including the size, cost, and professional roles involved in the development.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75803 (Palestine)

One email per change. Unsubscribe in one click. Privacy.

New Convenience store is a New Construction project located at 2601 State Hwy 155 in Palestine, Texas. The project has an estimated value of $2.0M covering 5,210 sq ft. Moonlight Management, LCC is the property owner and G2 DESIGN STUDIO is the design firm of record. The project was registered with TDLR on February 13, 2025.

Frequently Asked Questions

Is the new convenience store open?

The TDLR record has not yet recorded a final inspection, so the project's completion is not confirmed in the public record. The filing indicates construction was scheduled to finish in January 2026, but there is no public confirmation of business operations.

Who is building the store?

Moonlight Management, LCC is the owner of record, and G2 Design Studio is the design firm. The project is privately funded and located at 2601 State Hwy 155 in Palestine.

How large is the new building?

The new convenience store has a total area of 5,210 sq ft. This includes space for the retail store and the gas station fueling areas.

What is the estimated cost?

The estimated cost for the new construction is $2,000,000. This figure is above the median estimated cost of $800,000 for new construction projects in Anderson County.

What is New Convenience store?

New Convenience store is a new construction project at 2601 State Hwy 155 in Palestine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New convenience store, 5210 sf, Gas Station-auto and truck fueling

Is New Convenience store open in Palestine?

New Convenience store was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is New Convenience store located?

New Convenience store is located at 2601 State Hwy 155, Palestine, TX, 75803, in Anderson County.

Who is the owner or developer of New Convenience store?

Moonlight Management, LCC is the property owner/developer of record for New Convenience store, per its TDLR project registration.

Who is the architect or design firm for New Convenience store?

G2 DESIGN STUDIO is the design firm of record for New Convenience store, according to its TDLR filing.

How much does New Convenience store cost and how big is it?

New Convenience store has an estimated construction value of $2.0M and approximately 5,210 square feet (about $384/sqft), based on its TDLR filing.

Scope of Work

New convenience store, 5210 sf, Gas Station-auto and truck fueling

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2601 State Hwy 155, Palestine, TX, 75803

31.79131, -95.61846

Watch all construction in 75803 (Palestine)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Palestine?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.