Back Nine Golf 114th & Slide is a renovation/alteration project at 11417 Slide Road Suite 200, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $250K across about 2,292 sq ft.
Final inspection completed, awaiting project closure
Back Nine Golf 114th & Slide is a Renovation/Alteration project located at 11417 Slide Road Suite 200, Lubbock, TX 79424 in Lubbock, Texas. The project has an estimated value of $250K covering 2,292 sq ft. 11601 SLIDE LP is the property owner and WCA Design Studio, LLC is the design firm of record. The project was registered with TDLR on February 19, 2025.
Back Nine Golf 114th & Slide is a renovation/alteration project at 11417 Slide Road Suite 200 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish retail finish out
Construction on Back Nine Golf 114th & Slide is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Back Nine Golf 114th & Slide is located at 11417 Slide Road Suite 200, Lubbock, TX, 79424, in Lubbock County.
11601 SLIDE LP is the property owner/developer of record for Back Nine Golf 114th & Slide, per its TDLR project registration.
WCA Design Studio, LLC is the design firm of record for Back Nine Golf 114th & Slide, according to its TDLR filing.
Back Nine Golf 114th & Slide has an estimated construction value of $250K and approximately 2,292 square feet (about $109/sqft), based on its TDLR filing.
Interior tenant finish retail finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 19, 2025
Review Complete
Feb 19, 2025
Inspection Complete
Apr 1, 2026
Closed
406d
Construction phase